06-1193-1.doc
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning • Building • Engineering
Plan Review Corrections
Plan Check : Date:
# 2006-1193 November 28, 2006
Project Name/Address:
Ronquillo/761 Daley ST
th
Contact Person/Address/Fax:
JanetteRonquillo/8817 207 PL SW Edmonds, Wa 98026/Phone: 425-673-0163
Reviewer: Jaime HawkinsDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed:
There is an existing 6-inch sewer cleanout located at the SW property corner. Is this cleanout the
cleanout for the existing sewer? If so, please show in the site, grading, and drainage plans. Make
sure to delete/remove the proposed side sewer shown in all the plans. If the new side sewer is
connecting to this cleanout, please show the proposed side sewer from the cleanout to the house
in all the plans.
All impervious surface run-offs are to be collected and detained in the proposed detention system
prior to being released. You are showing the SW downspout connecting to the existing catch
basin located in the SW property corner. Please remove the proposed tight line and note form all
the plans.
Please show the footing tight line from the house to the out-fall side of the detention system.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE MAILED 11/28/06 PAGE
_1___ OF __1_