Loading...
06-1193-1.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # 2006-1193 November 28, 2006 Project Name/Address: Ronquillo/761 Daley ST th Contact Person/Address/Fax: JanetteRonquillo/8817 207 PL SW Edmonds, Wa 98026/Phone: 425-673-0163 Reviewer: Jaime HawkinsDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed:  There is an existing 6-inch sewer cleanout located at the SW property corner. Is this cleanout the cleanout for the existing sewer? If so, please show in the site, grading, and drainage plans. Make sure to delete/remove the proposed side sewer shown in all the plans. If the new side sewer is connecting to this cleanout, please show the proposed side sewer from the cleanout to the house in all the plans.  All impervious surface run-offs are to be collected and detained in the proposed detention system prior to being released. You are showing the SW downspout connecting to the existing catch basin located in the SW property corner. Please remove the proposed tight line and note form all the plans.  Please show the footing tight line from the house to the out-fall side of the detention system. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE MAILED 11/28/06 PAGE _1___ OF __1_