06-42 vassar-edwards plt.doc
Name: Vassar-Edwards File No.: S-06-42
th
Reviewed by: Vicinity: 19206 80 Ave W.
Engineering Division date
Provide 10.00 foot street dedication to the City of Edmonds X
Provide all easements as needed. X
Lots 1 and 2 shall share a private driveway access. X
Private access easements shall be 15.0 feet in width X
Private driveway access shall be paved a minimum of 12.0’ X
wide plus 18” asphalt thickened edge. 6” concrete extruded
curb may be used
Construct 18” concrete curb and gutter along the property X
nd
frontage on 192 St SW
th
Install a curb ramp, per City Standards at the corner of 80 X
nd
Ave W and 192 St SW
Slope of private driveway shall not exceed 14%. X X
Provide on-site turn around to City Standards. X
nd
Install a 5’ wide asphalt walkway along the frontage on 192 X
St SW..
th
Sidewalk exists along the property frontage on 80 Ave. X
N/A
N/A
Add a 4” storz adapter to the existing fire hydrant port on X
nd
192 St SW.
Provide water service to each lot. X
Connect to public water system. X X
Provide new sanitary sewer service to each lot X
C:\\Users\\cockrum\\AppData\\Local\\Temp\\06-42 vassar-edwards plt.doc_153086\\06-42 vassar-edwards plt.doc revised: 11/15/05
Connect to public sewer system X X
C:\\Users\\cockrum\\AppData\\Local\\Temp\\06-42 vassar-edwards plt.doc_153086\\06-42 vassar-edwards plt.doc revised: 11/15/05
Provide storm sewer service to all proposed lots. X
Construct storm detention system sized to provide adequate X
capacity for proposed single family dwellings and access
improvements in accordance with ECDC 18.30.
Connect to Public Storm system X X
Connect all new impervious surfaces to detention system. X X
Required for all new services X X
Submit a grading plan as part of engineered site plan. X X
Grading for foundations to be included with the building
permit only.
All signs shall be vinyl letters and to City Stds. No silk screen X
signs will be permitted
Provide Fire and aid address sign X
N/A
Required for all utility construction. X X
a) Plat showing lots, easements, legals, survey information X X
b) Legal documents for each lot X
c) Field stake lot corners (by professional surveyor) X
d) Field stake utility stubs at property lines. X
e) Clustered mailbox location per Postmaster X
f) Maintenance agreements X
C:\\Users\\cockrum\\AppData\\Local\\Temp\\06-42 vassar-edwards plt.doc_153086\\06-42 vassar-edwards plt.doc revised: 11/15/05
($ X
a) Storm System Development charge
)
b) Storm System Development charge (sfr) X
$428/lot
c) Sewer LID fees to be paid in full X
d) Sewer Connection fee (new lots only) X
$730/lot
e) Water meter fee (based on ¾”) X
$550/meter
f) Water Connection fee (new lots only) X
$908/lot
g) Traffic Impact Fee $840.72/lot X
$840.72
$860.X
h) Plan Review fee
$TBD X
i) Plat inspection fee (2.2% of improvement costs)
ENGINEERING PROGRAM MANAGER, CITY OF EDMONDS DATE
The Engineering requirements have been completed and the subdivision can be recorded.
Authorized for recording by: Date:
C:\\Users\\cockrum\\AppData\\Local\\Temp\\06-42 vassar-edwards plt.doc_153086\\06-42 vassar-edwards plt.doc revised: 11/15/05