Loading...
0684_001.pdfOI. CITY OF EDMONDS 121 5TH AVENUE NORTH -EDMONDS, WA 98020 sC° PHONE: (425) 771-0220 - FAX: (425) 771-0221 *PERMIT MUST BE POSTED ON JOBSITE* STATUS: ISSUED ENG20190069 RIGHT OF WAY PERMIT (I -Single Family) Permit Number: ENG20190069 Expiration Date: 04/01 /2020 Job Address: 820 DAYTON ST, EDMONDS JOHN L E ZIMMERMAN ZIMMERMAN KRISTINE A 820 DAYTON ST LICENSE 4: EXP: EDMONDS, WA 98020 JOB DESCRIPTION Utility installation and frontage improvements. Location: DISRUPTION I[NFORMATION ASSESSED VALUE: $0 00 PROPERTY AREA. 0 SIDEWALK: (OXO) DURATION IN MONTHS: 0 FEE: $0 00 STREET DISRUPTION TRENCH CUT: ( 0 X 0 ) PARKING: ( OXO ) DURATION IN MONTHS: 0 FEE: $0 00 YEAR OF OVERLAY: 0 FEE: $0 00 ALLEY: ( OXO ) DURATION IN MONTHS: 0 FEE: $0 00 INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims ofany kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any ofits departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and attorney fees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FORA PERIOD OFONEYEAR FOLLOWING THEFINAL INSPECTION AND ACCEPTANCE OFTHEWORK. • Traffic Control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possesion. • Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday- NO EXCEPTIONS. • Three sets of construction drawings of proposed work are required with the pem-dt application. CALL DIALrA-DIG (1-800-424-5555) BEFORE ANY EXCAVATION CALL FOR INSPECTION (425) 771-0220 EXT.1326 24 HOUR NOTICEREQUIRED FOR ALL INSPECTION REQUESTS THIS APPLICATION IS NOTA PERMITUNTIL SIGNED BY THE CITY ENGINEER OR HIS/HER DEPUTY: AND FEES ARE PAID, AND RECEIPTIS ACKNOWLEDGED IN SPACE PROVIDED Printed: Tuesday. April 02. 201 RELEASED BY FII �E COPY ❑ INSPECTOR COPY ❑ APPLICANT COPY STATUS: ISSUED ENG20190069 • Restore ROW to City standards • Restore Landscape to like or better conditions. • Call for locates of underground utilities priorto any excavation. • Alert affected residents and/or businesses priorto work start. • Conform to approved working drawings and Traffic Control plan. • Public utilities maintain 5' separation from City Utilities. • Verify clear bore crossings • Utility patch restoration to be in accordance with Edmonds Standard detail E2.3 • Maintain- erosion -&-sedimentation-control. Keep street clean. • Call for required inspections as noted. • Traffic Control per approved plan and MUTCD. Refer to City of Edmonds traffic control requirements. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits ofECC Chapter 5.30 only during the hours of 7:00amto 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. • E-Erosion Control/Mobilization • E Traffic Control • E-Curb/Glitter Pre -Pour • E-Sidewalk Pre -Pour • E_Driveway Form & Slope Ver. • E_Pavement Subgrade • E-Pavement Compaction Test Report • F Storm Stub to Property Line • E-CB Install on City Storm Main • E-Garb/Glitter Post -Pour • E-Sidewalk Post -Pour • E-Pavement Striping • E-Engineering Final PARTIAL INSPECTION DATE: INITIAL: NOTES: PARTIAL INSPECTION DATE: INITIAL: NOTES: FINAL INSPECTION APPROVED DATE: INITIAL: