Supplementary Report:
As requested, ESNW was onsite to observe geotechnical construction.
Prior to arrival of ESNW representative, the contractor had excavated a trench to tie into sanitary sewer main on 2nd
Avenue as shown in sketch below. The trench was approximately 8' -deep at maximum. The contractor installed
approximately 12" of 5/8 "minus" crushed rock directly over sanitary sewer PVC pipe and compacted using a
"jumping jack" compactor. 1-2' loose lifts of native material was backfilled into the trench and compacted using a
hoe -pack. The top approximate 12" of the trench was filled with 5/8" "minus" crushed rock as a leveling course, and
compacted with a hoe -pack.
Compaction tests showed adequate compaction of 95% or greater of the materials maximum dry density, at locations
tested.
N
Z -[ESS
,� v �aCA'fIoNS
TrrkN�N c
m
ESNW will r turn when requested.
HdnteTS4mo m._
COPY TO: CONTINUED ON NEXT PAGE
Field Rep.
Project No. Page of Report No..
4 Earth Solutions NWLLC
HGS
2550.02 1 1 2
1805 136'" Place NE, FAX:
Time On Site
Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
1:15 pm
4:30 pm 3/13/14 THURS
(425) 449-4704 (866) 366-8710
Travel Time
Weather
DAILY FIELD REPORT
1.0 HR
CLEAR, 55° F
Project Name Job Location
Client / Owner
Pineview 10202 nd Ave. S Edmonds
_ Sundquist Homes, LLC
General Contractor General Contractor's Superintendent
Received Onsite By
n _
Gradingg Contractor Grading Foreman
__--
Checked By
h
Ruhnn Scott
Construction
Are approved Plans/Permits onsite F] YES F-] NO Project No.
Permit No.
...
Reference
...
um
Fill Test Dry % of
Test Test Location Elevation
Number
CompactionDry
Moisture Density Maximum
7Denrsity
..................... �........
Curve
% lbs/ft3 Dry Density
5 SanitarySewer Tie -In _5 .................
1
119.0 14.28 115.0 97
___.
6 Sanita Se .._,
ry wer Tie -In -3'
1
119.0 12.20 115.4 97
7 SanitarySewer Tie In - "1'
_.
1 __._....
119 0 ......._.12.87 115.5 97.
m...........-... ..._.. _.
Supplementary Report:
As requested, ESNW was onsite to observe geotechnical construction.
Prior to arrival of ESNW representative, the contractor had excavated a trench to tie into sanitary sewer main on 2nd
Avenue as shown in sketch below. The trench was approximately 8' -deep at maximum. The contractor installed
approximately 12" of 5/8 "minus" crushed rock directly over sanitary sewer PVC pipe and compacted using a
"jumping jack" compactor. 1-2' loose lifts of native material was backfilled into the trench and compacted using a
hoe -pack. The top approximate 12" of the trench was filled with 5/8" "minus" crushed rock as a leveling course, and
compacted with a hoe -pack.
Compaction tests showed adequate compaction of 95% or greater of the materials maximum dry density, at locations
tested.
N
Z -[ESS
,� v �aCA'fIoNS
TrrkN�N c
m
ESNW will r turn when requested.
HdnteTS4mo m._
COPY TO: CONTINUED ON NEXT PAGE
Field Rep. Project No. Page of Report No.
Ir tq Earth Solutions NW«C HGS 2550.02 1 1 10
I +
1805 136" Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 2:15 pm 2:50 pm 4/8/14 TUES
(425) 449-4704 (866) 366-8710
Travel Time Weather
DAILY FIELD REPORT 1.0 HR L. RAIN, 55° F
.... ................. _.�.._.._ ...... ....._� __ _.. .... _ _........_....._.�
Project Name Job Location Client / Owner
Pineview 10202 nd Ave. S Edmonds _ Sundquist Homes, LLC
General Contractor General Contractors Superintendent Received Onsite By
Grading Contractor
Ruhnke Construction
Gradin
Scottg Foreman
Checked B
By
Ki lG
_ ..�.
Are approved Plans/Permits onsite
YES NO
Project No.
Permit No.
......
....
......
Reference
MaximumFill
Test Dry
% of
Test Test Location
Number
Elevation
Compaction
Dry Moisture
Density
Density
Maximum
Curve
%
lbs/ft
lbs/ft3
Dry Density
12 Sewer TrenchWWBackfill
SG_
mmmmmIT1 119.0 10.4ITITITITIT-
1
113.6
95
13 Sewer Trench Backfill
SG
1
119.0 9.60
116.3
98
.... ....
Supplementary Report:
As requested, ESNW was onsite to observe geotechnical construction activity.
Prior to arrival of ESNW Rep, the contractor had excavated the sanitary sewer trench serving the three side sewers
onsite. Upon arrival, the trench was being backfilled and compacted. Backfill material was observed to be native
poorly graded sand with some silt. Backfill was installed in approximate 18" lifts and compacted using a hoe -pack
followed by a large single drum vibrating roller. Trench was observed to be approximately 5' deep at its maximum
depth.
Compaction tests show adequate compaction of 95% or greater of the material's maximum dry density in locations
tested. Approximate test locations are shown on the sketch below.
T¢,ENck t
CxG�4v/fTrf�n/ O
C
C1R
ESN''i/U' will return when requested.
urrter Stnoak