Loading...
07-0471-5.pdfCity of Edmonds 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edrnonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check #: 2007-0471 Date: December 19, 2007 Project Name/Address: Marques/505 2nd Ave N Contact Person/Address/Fax: Ken Marques/PO Box 711 Manson, Wa 98831/Phone: 509 -607 -3736/e -mail: ksmpal@aol.com Reviewer: Jaime Hawkins Division: Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed: 1. Still Need (Pipe is 24ft in diameter and therefore invert elevation and rim elevation must have at least aft of difference to obtain a min. of lft cover). The detention pipe shall have a minimum cover of 1 -ft. Still Need (detention pipe should have slope from CB#1 to CB#2 of 0.5% to 1%) Please make sure that the rim and invert elevations for all proposed catch basins will work and will allow the proposed detention system to drain to the City of Edmonds storm system. 2. Done 3. Done 4. Connection for trench drain tightline not clear. Please connect to roof drain at cross or connect directly to CB#1. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 12/19/07 PAGE 1 OF 1