Loading...
07-0493-1.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # 2007-0493 January 30, 2007 Project Name/Address: Harbor Inn Pool/130 West Dayton ST th Contact Person/Address/Fax: Charles Beavers P.T. Construction/21805 98 Ave W/Phone: 425-218- 1642/Fax: 425-775-9650/e-mail: pools365@verizon.net Reviewer: Jaime HawkinsDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed: 1.Show the minimum Temporary Erosion and Sediment Control in the site plan. Please refer to City of Edmonds standard detail E1.1 You may find this detail by visiting the City of Edmonds web site at www.ci.edmonds.wa.us and clicking on City Government-Development Services-Engineering Division and scroll down to handouts and forms. 2.Please refer to the City of Edmonds Swimming Pool Permit Submittal Requirements, #B75. Please submit all pertinent and required information regarding the pool. I.e. grading plan, pool drainage detail, etc. Show the location of existing potable water and sewer lines in the property. · Indicate the proposed location of the sewer clean-out for pool drainage purposes. Pursuant to ECDC · 19.00.005(c) 12, a means of disposal of the total contents of the pools shall be reviewed and approved by the Public Works Director. (a) No direct connection shall be made between any swimming pool, hot tub or spa to any storm drain, city sewer main, drainage system, seepage pit, underground leaching pit, or sub-soil drain. (b) A sanitary sewer tee (outside clean-out installed on the main building sidesewer line) shall be provided for draining of treated water into the sanitary sewer system. For in ground swimming pools, submit three (3) copies of a grading plan, scaled 1”=20”, with · yardage calculations that specify the number of cubic yards to be removed filled or graded. Show the existing grade contour and proposed finished grades at two (2) foot intervals. Indicate setbacks from top and toe of slopes, the slope of the lot, and methods for temporary and permanent erosion control. Provide calculations and specify the number of cubic yards to be removed, filled or graded. NOTE: Grading in excess of 499 cubic yards of fill, excavation or cut must submit SEPA Environmental DATE FAXED 6/25/07 PAGE __2__ OF _2__ Checklist (See Handout #P71) and Adjacent Property Owners (APO) list (See Handout #P2) for review. Contact the Planning Division for fees and processing information. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED 6/25/07 PAGE __2__ OF _2__