Loading...
07-0634 Plan Review Comments 2.pdf CE th ITY OF DMONDS • 1215 AN•E,WA98020 VENUE ORTH DMONDS P: 425.771.0220 • F: 425.771.0221 • W: www.ci.edmonds.wa.us HONEAXEB DSD: P•E•B EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING August 20, 2007 Debbie Saucedo th 23318 96 Avenue W Edmonds, WA 98020 RE: PLAN REVIEW COMMENTS #2 FOR PLAN CHECK # 2007-0634 TH PORCH AT 23318 96 AVENUE WEST Dear Ms. Saucedo: I have again reviewed the above building permit application for the Planning Division. Thank you for submitting the setback information for the porch; that greatly assists my ability to process your permit. However, I still need revisions to the following items before I can sign off: Datum Point 1.. The site plan states an elevation base of 100’ and shows the datum point to be the centerline of the street. The datum point must be a permanent point of reference such as the top of a manhole cover or street monument. The base elevation can either be 100’ or the listed elevation on the marker but the height calculations for the building/addition must be derived from the base elevation. Please revise the site plan accordingly. Height Calculations. 2. On the site plan, the height of the porch needs to be calculated relative to the datum point. Once you choose a satisfactory datum point, the corner heights for the porch must be identical on the site plan and in the ‘height calculations’ table. Also, the table (and the elevation view drawings) must show accurate measurements for average existing grade, maximum allowed height, and actual height of the porch. Please make all resubmittals to a Development Services Permit Coordinator, Monday through Friday, 9:00 am to noon or 1:00 pm to 4:00 pm. If you have any questions, feel free to contact me at 425-771-0220 (x1330). Sincerely, Development Services Department - Planning Division Mike Clugston Planner