Loading...
07-0691 Plan Review Comments_revisions II (2).pdfCITY OF EDMONDS • 121 5th AVENUE NORTH • EDMONDS, WA 98020 PHONE: 425.771.0220 • FAX: 425.771.0221 • WEB: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT: PLANNING • ENGINEERING • BUILDING March 4, 2008 Kristin Hansen hansondesign@hotmail.com RE: PLAN REVIEW COMMENTS #2 - REVISIONS TO PLAN CHECK # 2007-0691 TOBIASSEN STUDIO AT 24126 105TH PLACE WEST Dear Ms. Hansen: Thank you for submitting the height survey in support of the Tobiassen’s studio permit. I have two questions before I can sign off on the permit: 1) Datum Point. Please clarify if a concrete marker was in fact established as the datum point near the position of the nail in the fence that had been referenced previously or if the nail was again used. 2) Side Setback. Please clarify the side setback of the accessory structure. The side setback in the RS-8 zone is 7.5 feet but the survey indicates the southeast corner of the structure to be setback only 7.4 feet. If height point “G” was in fact taken at 7.4 feet from the southern property line, the point will need to be reshot 0.1 feet to the north. If that is the case, please update the height calculations – total, average and maximum – to account for any elevation change to point “G”. Please make all submittals to a Development Services Permit Coordinator, Monday through Friday, 8:00 am to 4:00 pm; we are closed Wednesdays. If the changes are minor, they can also be redlined on the existing plans. If you have any questions, feel free to contact me at 425-771- 0220. Sincerely, Mike Clugston, AICP Planner