Loading...
07-0725 Plan Review Comments.pdf CE ITY OF DMONDS th • 1215 AN•E,WA98020 VENUEORTHDMONDS P: 425.771.0220 • F: 425.771.0221 • W:www.ci.edmonds.wa.us HONEAXEB DSD: P•E•B EVELOPMENT ERVICES EPARTMENTLANNINGNGINEERING UILDING August 15, 2007 Poppi Handy, AIA Email: poppihandy@yahoo.com RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2007-0725 TH PETSCHL ADDITION/REMODEL AT 275 – 4 AVENUE SOUTH Dear Ms. Handy: I have reviewed the above building permit application for the Planning Division and it was found that the following information, corrections, or clarifications will need to be addressed before review can continue: Setbacks: 1.The minimum required side setback for the RM-1.5 zone is 10 feet. The site plan for your proposal shows 7-foot existing side setbacks from the northern and southern property lines. Pursuant to ECDC 17.40.020.B, although the existing building does not meet the minimum required 10-foot side setbacks, all new additions must meet these setbacks. Therefore, the proposed upper level addition must be cut back so that it meets the minimum required 10-foot side setbacks from the northern and southern property lines. Please update your site plan and building plans to reflect this change. Note that per Interpretations File No. 2006-1, “Enclosing an existing carport by turning it into a garage is a legal activity that complies with the City’s nonconforming rules.” Therefore, the existing side setbacks may be maintained for the conversion of the carport into a garage. Height Calculations: 2. It was noted that you are not proposing to increase the height of the existing structure. However, pursuant to ECDC 17.40.020.B, if the existing structure is above the maximum allowed height for the RM-1.5 zone, the addition will need to be lower in height so that it meets the maximum allowed height for the zone. Please provide height calculations on your site plan to show that the height of the addition is less than 25 feet in height over original grade. The City’s height calculation handout is enclosed for your reference. Design Review: 3. Since your proposed project is open to exterior view and is increasing the square footage of the existing building, the proposal is subject to the design review requirements of ECDC 20.10. The elevation drawings submitted with your building permit application will be sufficient for staff to conduct design review on your project. Please note that the required $100 design review fee has been added to your building permit application and will be due when the permit is issued. There is no need to respond to this item; it is included for informational purposes only. Please submit three copies of the updated site plan (at least one copy must be reduced in size) and only two copies of any affected sheets of the building plans. Please make all submittals to a Development Services Permit Coordinator, Monday through Friday, 9:00 am to noon or 1:00 pm to 4:00 pm. If you have any questions, feel free to contact me at (425) 771-0220, ext. 1224. I look forward to working with you on this project. Sincerely, Development Services Department - Planning Division Jen Machuga Planner