Loading...
07-0921 Plan Review Comments (2).pdfCITY OF EDMONDS • 121 5th AVENUE NORTH • EDMONDS, WA 98020 PHONE: 425.771.0220 • FAX: 425.771.0221 • WEB: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT: PLANNING • ENGINEERING • BUILDING September 28, 2007 Kathryn Wohnoutka kwohnoutka@msn.com RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2007-0921 ADDITION AT 938 PINE STREET Dear Ms. Wohnoutka: I have reviewed the above building permit application for the Planning Division. Before I can sign off on the permit, however, the following information needs to be clarified: 1. Height Calculations. The site plan indicates an incorrect average grade (104.75’ instead of 104.88’) and, therefore, maximum grade (129.75’ instead of 129.88’). In addition, it appears that the actual height calculation is off as well. The site plan indicates an actual height of 118.75’. The elevation does as well but also shows the height of the structure to be approximately 22’. If the structure is 22’, then the actual height calculation would be somewhere around 127’. You may either redline your existing plans of submit new copies. Please make all submittals to Theresa Umbaugh, your Development Services Permit Coordinator, Monday - Friday, 8:00 am to 4:30 pm, except Wednesdays when the office is closed. If you have any questions, feel free to contact me at 425-771-0220 (x1330). Sincerely, Mike Clugston Planner