071100-Holt revisions.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: 2/25/09 TO: Ben Holt ben@peoples-storage.com 22508 76TH AVE W Edmonds, WA 98026 FROM: Pat Lawler RE: Plan Check: BLD20071100 Project: SFR Project Address: 1141 Sea Vista Pl During review of the revised plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1.Provide revised engineering calculations and full sized sheets for the impacts from the proposed changes. Both lateral and gravity alanysis are required. a.Additional windows, walls deleted or moved, large point loads from the increased spans of the steel beams all need to be addressed. b.It does not appear to me that the full weight of the 64 foot spanned trusses with tile roofing has been calculated into the steel beam calculations. The copy of the Steel beam design submitted with this revision application has the load lines above the beams overlapping and undecipherable. Provide a legible documents. c.Justify the new steel columns for the height and point loads. Identify which post and what the loads are. d.The same for the footings. It would be very helpful if one of the calc pages could show the major point loads at each footing. e.The railing spec., note d on sheet S, call for a safety factor of 2.5. For glazed guards, the safety factor is required to be 4, as per Table R301.5(i). Correct on plans. f.Enginner to provide a Statement of special inspections per IBC 1704.1.1 2.The City of Edmonds Special Inspection Form is required to be completed based upon the special inspection requirements. 3.Provide a stamped set of the engineered truss drawings for this project. This will be used to confirm that the loading for the roof structure is fully taken into account through to the foundation. 4.Provide attachment details for the ripped 2x8 rafters onto the trusses. Include compliance with the lateral requirements for the trusses per the truss engineering. Show the slope, roof drain and overflow/scupper locations and details. Include materials to be used. 5.The hot tub will be required to have a safety cover that meets both the WSEC and the ASTM-F 1346. Please note this on the plans. Pat Lawler patrick.lawler@ci.edmonds.wa.us Plans Examiner 425 771 0220 x1703 Page 2 of 2