07-1162 Plan Review Comments 2.pdf
CE
th
ITY OF DMONDS
1215 ANE,WA98020
VENUE ORTH DMONDS
P: 425.771.0220 F: 425.771.0221 W: www.ci.edmonds.wa.us
HONEAXEB
DSD: PEB
EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING
December 12, 2007
Glenn Hyldahl
Project Manager, HASCO
th
12625 4 Avenue W #29
Everett, WA 98204
RE: PLAN REVIEW COMMENTS #2 FOR PLAN CHECK # 2007-1162
RD
REMODEL OF SOUNDVIEW APARTMENTS AT 417 3 AVENUE S
Dear Mr. Hyldahl:
Thank you for addressing my initial comments from November 27, 2007. I have two additional
clarifications to request:
Building Height:
1.Please provide height calculations for the structure (see attached
handout). It appears that the building is nonconforming structure with respect to height.
The parcel is zoned RM-2.4 which has a maximum height of 25 plus an additional 5 for
roofs with a 4:12 pitch or greater. Any changes to the building that would increase the
nonconformity of the buildings height repair of the elevator penthouse (Note 25, Sheet
A3.2) or repair of the wood parapet band (Note 25) would not be allowed.
Exterior Colors
2.: Please provide samples of the colors described in the Exterior Paint
chart, particularly of the newly remodeled siding (Note 34, Sheet A3.2). From the
photographs provided with the application, it appears there has been a color change
between what existed previously (beige) and the new siding (light brown or salmon -
Weiss Paint System Color WP-1120). This change will be reviewed along with the other
changes proposed as part of the Design Review for the project.
Please make all submittals to Theresa Umbaugh, your Development Services Permit Coordinator,
Monday through Friday, 8:00 am to 4:30 pm; we are closed Wednesdays. If you have any questions,
please contact me at (425) 771-0220.
Sincerely,
Mike Clugston
Planner