Loading...
07-1195 Plan Review Comments.pdf CE th ITY OF DMONDS • 1215 AN•E,WA98020 VENUE ORTH DMONDS P: 425.771.0220 • F: 425.771.0221 • W: www.ci.edmonds.wa.us HONEAXEB DSD: P•E•B EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING December 27, 2007 Ronald D. Johnson ronmaile@verizon.net RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2007-1195 DUPLEX AT 656 DALEY STREET Dear Mr. Johnson: I have reviewed the above building permit application for the Planning Division and found that the following information, corrections, or clarifications will need to be addressed before review can continue: Lot Combination. 1.A lot combination was approved to join the church’s parking lot parcel and 658 Daley Street (PLN20070051). The site and landscape plans do not indicate the updated parcel boundaries. Please submit new site and landscape plans that correctly identify the new parcel bounds or redline the existing plans to remove the northwest and southwest corner markers and the ‘Note: Edmonds Open Bible owns…’ language on the plans and reference the approval in PLN20070051. Fence. 2.A six foot cedar fence is proposed for the site. The fence is not indicated on the site plan or the landscape plan. Please add the feature to both plans. Placement of the fence must meet the requirements found in ECDC 17.30. Landscape Plan. 3.Several issues need to be addressed: a.It is uncertain if the landscape plan submitted with this building permit is to be reviewed for the entire site or just for that area surrounding Building 2. The ADB approved the landscape plan for the entire site during their review of the project (ADB-2007-0006). If the current review is to only include improvements around Building 2, a performance bond would be required to ensure completion of the improvements on the northern portion of the property. b.The street trees required by the Architectural Design Board are mentioned on the landscape plan but their locations are not shown. Please add the appropriate street trees to the plan and the legend. Due to space limitation, it is anticipated that the street trees would be included in the front yards of both units. The ADB mentioned the possibility of using a Ginko tree to replace the existing evergreen on the northwest portion of the property as opposed to an Alaskan Yellow Cedar and adding another Ginko in front of the stairs on Building 2 along Daley Street. Similarly, the Urbanite Ash at 2” to 2.5” caliper could be added to the lawn area th east of Building 1 along 7. An additional Urbanite Ash could be added along the eastern edge of Building 2 or replace one of the existing deciduous trees along that facade. c.The ADB requested additional plantings of Fragrant Sweet Box/’Saracococca ruscifolia’ for the eastern planting area. Please indicate these on the landscape plan. d.The ADB requested a new location for the proposed Metasequoia at the northeast corner of Building 1 due to potential space concerns. It was noted that the roof for the elevator shaft was redesigned and better incorporated into the roof for the rest of the building. Thank you. You may redline your plans to reflect any changes; or, if you are submitting new plans, please submit 3 site plans (one must be reduced size) and 2 sets of the updated pages of the building plans. Please make all submittals to Marie Harrison, your Development Services Permit Coordinator, Monday through Friday, 8:00 am to 4:30 pm; we are closed Wednesdays. If you have any questions, please contact me at (425) 771-0220. Sincerely, Mike Clugston Planner