Loading...
0756_001.pdf., a� G6Mo CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION $1 9 (425) 771-0220 City Website: www.edmondswa.gov DATE: February 20, 2019 FROM: Chris Rivera, Engineering Tech. Chris.rivera@edmondswa.gov RE: Application #: bld20190088 Project: Tenant Improvement Project Address: 123 3rd Ave S. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents with a written response to each of the items below to a permit coordinator. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. ***Based on a meeting held with Coast Bank, City of Edmonds Engineering Department and the Fire Department on 1/31/19, it was determined that a riser room, fire sprinklers and DCDA would be required in order to allow for addition occupancy. For this reason, we will need an updated site plan providing the following. 1. Show city right of way (3rd Ave S.) - street, curb/gutter, sidewalk, striping, vegetation and all items at the surface that may affect proposed fire line route within the right of way. / La, o 2. Show city utilities; water, sewer and storm as well as their appurtenances (i.e. catch basins, manholes, valves, etc.). Please also show dry utilities; communications, power and gas as well as their appurtenances (utility poles, vales, vaults, etc.). Q_2.0 3. City requires that a minimum of 5' horizontal and F vertical separation from city utilities (sewer, water &storm) be meet within the right of way (3' separation in private property). 4. Show the proposed fire line connection from the city water main to the DCDA. As well as connection to the building. •© 5. Show location of proposed DCDA on updated site plan and provide city detail WA-142A & WA-142B on a separate detail sheet. ei�.1 6. Please note, additional comments not included in this review may be produced after reviewing the next submittal.