Loading...
08.20.2010-Main_St-323-TIA.pdfCITYOF EDMONDS TRAFFIC IMPACT ANALYSIS WORK SHEET Name of Proposed Project- ---- I ��;5 MM N �/rE-(71 T Owner/Applicant: Narne 'v(, Stre=aifing Address ............. I city State zip Telephone. - Traffic Engineer who prepared the Traffic Impact Analysis: Firm Hanle Contact Name a. Street address (if known): .5 5i -&A M b. Locator: ),Nf ?) �A,-,±v (Attach a vicirsity map and siteplan.) c. Specify existing land use: d. Specify OEproposed type and size of development: g M e. Whet) will the project begin construction and when will it be completed? f Define proposed access locations: g. Define, proposed sight distance at site egress locations: (f�-J,4 66� W= 7. MITIGATION IZECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated frorn the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82,120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted, if the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square -feet, Fee Rate 4 of dwelling, vf etc. NewUse 11'rior Use , X 'all I k d Fee FNew Use Fee : Prior Use Fee: $ j�r�v""J" $ 4:A 4 -71 J01 L- - =0111K,11,517133 01,11W 'UNFESTMI Units in ITE Land Use Category Per Unit square feet, Fee Rate of dwelling, New Use $ X Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124110 E82 - 7)-af ,ffc Impact Analysis Worksheet Page 5 c?f 5