Loading...
08-0167 Plan Review Comments - 2nd Review.pdf CE ITY OF DMONDS th • 1215 AN•E,WA98020 VENUEORTHDMONDS P: 425.771.0220 • F: 425.771.0221 • W:www.ci.edmonds.wa.us HONEAXEB DSD: P•E•B EVELOPMENT ERVICES EPARTMENTLANNINGNGINEERING UILDING April 7, 2008 Mr. Zeke Farnsworth Cascade Builders NW Inc. Email: zekefarnsworth@aol.com RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2008-0167 TH TATE ADDITION AT 23919 – 106 PLACE WEST Dear Mr. Farnsworth: I have reviewed your resubmittal dated March 28, 2008 for the above building permit application for the Planning Division, and it was found that the following information, corrections, or clarifications will need to be addressed before review can continue. Height Calculations: 1.Please make the following corrections to your height calculations: a.It was noted that when you updated your height rectangle, you did not provide the elevation of Point A, which falls off-site, as an average of the two points where the height rectangle crosses the northern property line. Therefore, please follow the directions of ECDC 21.40.030.B, which states, “If a corner falls off the site, its elevation shall be the average elevation of the two points projected downward where the two sides of the rectangle cross the property line.” Please provide the elevations of the two points where the height rectangle crosses the northern property line and then provide Point A as the average of these two points. Make any necessary updates to the height calculations if the elevation of Point A changes with this update to the plans. b.As stated in my last letter, the average grade, proposed height, and maximum height as shown on the site plan and building elevations should be updated to reflect the updates in elevation of the four corners of your height rectangle. The maximum allowed height, however, was not updated. Therefore, please provide the maximum allowed height as the average height plus 25’. Note that the elevations used for the height calculations may not be rounded up, so the average grade based on your current elevations of Points A through D would be 101.06’ and the maximum height would be 126.06’. Note that this average and maximum may change when you address the comment above and correct the elevation of Point A. The average and maximum heights should be updated on both the site plan and the building elevations. Please make all submittals to a Development Services Permit Coordinator, Monday through Friday, excluding Wednesdays, between 8:00 am and 4:30 pm. If you have any questions, feel free to contact me at (425) 771-0220, ext. 1224. Sincerely, Development Services Department - Planning Division Jen Machuga Planner