Loading...
08-0198 Plan Review Comments2.pdf CE ITY OF DMONDS PLANREVIEWCOMMENTS PLANNINGDIVISION 425.771.0220 DATE: August 13, 2008 TO: Tony Shapiro tonys@adshapiro.com FROM: Kathleen Taylor, Associate Planner ND RE: PLAN CHECK # 2008-0198 (2 REVIEW) TH 5 AVE EIGHT TH SHORING & FOUNDATIONS FOR 215 5 AVE N On behalf of the Planning Division, I have reviewed the above building permit application. Please respond in writing to the following: Site Plan. a.PUD Transformer. In order to approve the shoring & foundation only permit, I would suggest removing the PUD Transformer from the site plan. It can be included with the building only permits, and that way it will not hold up the processing of this permit. However, it may not be located within the setbacks, unless it is less than 36” in height; even then it will require screening. 2.Datum point. Rather than referencing other documents, please add the datum point to the site plan. In reviewing the survey, it notes the benchmark as a concrete corner in the sidewalk. The datum needs to be a manhole cover, fire hydrant, or other related permanent point of reference. There are some on the survey that can be used, but some of the elevations have been cut off, and I cannot read the entire number. You may red-line the existing plans or submit new copies. Make all submittals to a Development Services Permit Coordinator, Monday, Tuesday, Thursday or Friday, 8:00 am to 4:30 pm. If you have any questions, feel free to contact me at 425.771.0220.