Loading...
08-0198,99,203,204 Plan Review Comments2.pdf CE ITY OF DMONDS PLANREVIEWCOMMENTS PLANNINGDIVISION 425.771.0220 DATE: May 15, 2008 TO: Tony Shapiro tonys@adshapiro.com FROM: Kathleen Taylor, Associate Planner RE: PLAN CHECK # 2008-0198, 199, 203, 204 TH 5 AVE EIGHT TH SHORING & FOUNDATIONS FOR 215 5 AVE N On behalf of the Planning Division, I have reviewed the above building permit applications. Please respond in writing to the following: 1.SEPA. The grading calculations submitted by the engineer indicate removal of 4,993 cubic yards. SEPA was issued for up to 4,500 cubic yards. Since the increase is approximately 10%, I will issue an addendum to the original SEPA determination. There is no appeal period for an addendum. 2.Landscape Plan. a.The landscape plan shows an unidentified area just south of building C. It encroaches into the setback. Is it a patio? Please label what it is on the landscape plan and add it to the site plan as well. Also a symbol that typically indicates mechanical equipment is shown within this area. Please identify and/or remove it from the site plan. Mechanical equipment cannot be located within the setbacks. b.Please clarify if you are looking for approval of the landscape plan with this permit or you would like it to be reviewed and approved with the permits for the actual buildings, not the foundation only permits. 3.Patios. Patios need to be shown on the site plan. They can encroach into the street setback by 4 feet only (11 feet from the property line) and encroach into the side setback by only 3.3 feet (6.67 feet from the property line). Please reduce the patio area(s) accordingly. 4.Height Calculations. FYI only. Since height calculations are not formally reviewed with these applications, a correction/clarification is not necessary at this time. a.Building A. The height rectangle for Building A appears to extend beyond the building. The height rectangle should include the portion of the building above ground, but exclude the roof overhang (up to 30” of eaves) and the decks. Please clarify what it is including. b.Datum. Label the datum point on the site plan. 5.Lot Aggregation. FYI only. A lot line adjustment will be required to remove the center lot line and make it into one legal lot. You may red-line the existing plans or submit new copies. Make all submittals to a Development Services Permit Coordinator, Monday, Tuesday, Thursday or Friday, 8:00 am to 4:30 pm. If you have any questions, feel free to contact me at 425.771.0220 ext 1223.