Loading...
08-0509 Plan Review Comments1.pdf CE ITY OF DMONDS PLANREVIEWCOMMENTS PLANNINGDIVISION 425.771.0220 DATE: July 23, 2008 TO: George Ostrow george@velocipede.net FROM: Kathleen Taylor, Associate Planner RE: PLAN CHECK # 2008-0509 PCC RAINWATER HARVESTING SYSTEM On behalf of the Planning Division, I have reviewed the above building permit application. I have enclosed a copy of the interim zoning regulations for a rainwater collection tank (Ordinance no. 3682), which should be useful. Please make the following revisions, so that I can complete my review: 1.Height of Pad. The maximum height for the structure is 15 feet. Please revise the elevation view to show the height of the pad. The height of the rain tower should be measured from finished grade which would typically be interpreted as the ground below the pad. If the pad is only 1-2 inches, the pad height may not be an issue. 2.Setback Area Calculations. Please submit a site plan, delineating the entire th property frontage along 9 Avenue. Specifically identify the setback area (length th x width) along 9 Avenue. The required setback width is 20 feet. 3.Educational Components. Please refer to Edmonds Community Development Code 21.90.140B4 on page 3 of ordinance 3682.Please provide a response to this code requirement and identify how the project will comply with the regulation. For example, if there will be a plaque on the tower, provide a copy of it, colors, font size, etc. Will there be an obvious path through the landscaping, so that citizens can walk up to it? Will there be educational materials available in the store? Etc. You may red-line the existing plans or submit new copies. Make all submittals to a Development Services Permit Coordinator, Monday, Tuesday, Thursday or Friday, 8:00 am to 4:30 pm. If you have any questions, feel free to contact me at 425.771.0220 ext 1223. Thank you.