08-0879 Plan Review Comments (2).pdfCITY OF EDMONDS • 121 5th AVENUE NORTH • EDMONDS, WA 98020
PHONE: 425.771.0220 • FAX: 425.771.0221 • WEB: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT: PLANNING • BUILDING
October 22, 2008
Jeremy Moeller
CFM Heating and Cooling, Inc.
jeremy@cfm-hvacr.com
RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2008-0879
ROOFTOP MECHANICAL AT 303 5TH AVENUE SOUTH
Dear Mr. Moeller:
I have reviewed the above building permit application for the Planning Division. Before I can sign
off on the permit, however, the following information needs to be clarified:
1. Height: As indicated on the submitted elevation drawing (Sheet M2.0), the proposed rooftop
unit will be greater than the 25’ height limit applicable to the zone. Please review the City’s
Height Calculation handout (B41) at:
(http://www.ci.edmonds.wa.us/Public_Handouts/Building_handouts/B41-HEIGHT.pdf
and then recalculate the elevation of the proposed unit and indicate the average, maximum
and actual elevations on Sheet M2.0, as appropriate. If the unit does not fall under the 25’
maximum height, it will have to be located elsewhere.
Make all submittals to a Development Services Permit Coordinator, Monday through Friday, 8:00 am
to 4:30 pm, except on Wednesdays when we are closed for permit review. If you have any questions,
please contact me at (425) 771-0220.
Sincerely,
Mike Clugston, AICP
Planner