08-0938 Plan Review Comments (2).pdfCITY OF EDMONDS • 121 5°i AVENUE NORTH • EDMONDS, WA 98020
PHONE: 425.771.0220 • FAX: 425.771.0221 • WEB: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT: PLANNING • BUILDING
January 6, 2009
North Crest Development Group
PO Box 340
Edmonds, WA 98020
Attn: Rick Klemm
RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2008-0938
NEW 4-UNIT CONDOMINIUM (NORTH CREST) AT 620 GLEN STREET
Dear Mr. Klemm:
I have reviewed the above building permit application for the Planning Division. Before I can
sign off on the permit, however, the following information needs to be clarified:
1. Datum: Please indicate on the Site Plan the location and elevation of the datum point
used to calculate height for the project.
2. Scale: Please verify the scale on the Site Plan. It is described as 1:20 but the scale bar
indicates 1:10.
3.
Light Bollards: Please locate the lighting bollards described in Condition 9 of the
design approval (ADB-07-80) on the Site Plan
and/or Landscaping Plan-1.11 1 Ic rn Pr $,
4. Landscape Plan: Condition 5 of the design
approval states:
Appropriately sized Tilia cordata "Greenspire
Greenspire Linden trees shall be placed in new
planting areas (4' by 4' minimum) in the four
exterior corners of both driveways.
The intent of the condition was that additional 4'
by 4' planting areas are to be located at the
exterior corners of the driveways. These areas are
not currently shown on the Landscaping Plan. If
the condition was not sufficiently clear, I
apologize.
I've scanned the submitted Plan and indicated
where the additional planting areas are to be
located. The four Greenspire Linden are to be
planted in those areas with groundcover similar to
the remainder of the site. Groundcover and shrubs
36" !
KMI
ML
can be relocated to the spaces where the Greenspires are currently indicated.
5. Landscaping Bid: Please provide a cost estimate including all labor and materials
required to install the landscaping.
6. Trellis: Please indicate the design and height of the proposed trellis (which would
actually be termed an `arbor' with respect to the Edmonds Community Development
Code). According to ECDC 17.30.035.C.3, an arbor up to a maximum of nine feet may
be constructed over a gate, walkway or entrance.
Please make all submittals to a Development Services Permit Coordinator, Monday through
Friday, 8:00 am to 4:30 pm, except on Wednesdays when we are closed for permit review. If
you have any questions, please contact me at (425) 771-0220.
Sincerely
Mike Clugston, AICP
Planner