Loading...
08-0987 Plan Review Comments III.pdfCITY OF EDMONDS - 1215' AVENUE NORTH - EDMONDS, WA 98020 �PHONE: 425.771.0220 - FAX: 425.771.0221 - WEB: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT: PLANNING - BUILDING February 2, 2009 The Sign Factory Fax: 425-827-1074 Attn: Jim Minar RE: PLAN REVIEW COMMENTS III FOR PLAN CHECK # 2008-0987 POLE SIGN AT HARVEY'S (21116 HIGHWAY 99) Dear Jim: I received a request to perform a final inspection for the Planning Division at the above site. While the sign itself was fine, the landscaping at the base had not yet been installed. As a result, I cannot sign off on the final inspection. With the weather turning, it should be possible to safely do the landscaping installation now, At the same time, the permit doesn't expire until June 6, 2009, so you could wait another few months until the weather fully cooperates. On the other hand, you could provide a performance bond for the landscaping work. Performance bonds are for 100% of the cost of the work ($1,000 based on your estimate) which is reduced to a 15% maintenance bond ($150) after the work is completed. After two years, the maintenance bond is returned if a final inspection finds the landscaping is in good health. Let me know how you would like to proceed. Sincerely, Mike Clugston, AICP Planner