Loading...
090150-Lee Dental Office.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: 2/24/09 TO: Hanwoori Construction Attn: Jackie Kim 22727 Highway 99, Suite 204 Edmonds, WA 98026 FROM: Pat Lawler RE: Plan Check: BLD20090150 Project: TI Project Address: 22727 HWY 99 Ste 209 During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1.Provide plans showing existing conditions. 2.Provide 60 minute fire rated door at new opening into stairwell. 3.Show accessible route from parking to tenant space, and any proposed upgrades, if required, and the 20% cost involved above the bid for the proposed tenant improvements. 4.Provide door hardware schedule. Lever style hardware is required. 5.Provide dimensions at spaces adjacent to doors in the primary space to indicate maneuvering clearances at doors for accessibility compliance. 6.Is the proposed X-ray machine connected to the water supply? If so, indicate the method of backflow prevention. 7.Provide medical gas plans and apply for a separate medical gas permit. a.Is medical gas to be hardpiped or using portable containers? b.Provide testing and inspection requirements on the plans. c.Indicate what type of certified medical gas installer can install the gas piping. d.Prior to any medical gas system being placed into service, each and every service shall be verified as described in UPC 1328.2, and this shall be noted on plans. 8.Provide medical air plans. Include backflow prevention details. 9.For backflow prevention purposes, are the dental stations self-contained or are they plumbed into the plumbing system using a RPBA at each fixture? Indicate on plans and provide vacuum equipment specifications, if self contained. 10.Premise isolation is required for the tenant space. The service line to the building is only 1”. A Reduced Pressure Backflow Prevention Assembly is required and shall be located in a hot box at the meter. For questions regarding cross connection, please contact: 11.Is any HVAC system work proposed with this project? If so, identify the scope of work. Are registers only being relocated, or is a new system proposed? Pat Lawler patrick.lawler@ci.edmonds.wa.us Plans Examiner 425 771 0220 x1703 Page 2 of 2