09-0285 Plan Review Comments.pdf
CE
ITY OF DMONDS
th
• 1215 AN•E,WA98020
VENUEORTHDMONDS
P: 425.771.0220 • F: 425.771.0221 • W:www.ci.edmonds.wa.us
HONEAXEB
DSD: P•E•B
EVELOPMENT ERVICES EPARTMENTLANNINGNGINEERING UILDING
May 27, 2009
Darrin Mock
Chermak Construction Inc.
Email: darrin@chermak.com
RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2009-0285
PETERSON/MONTALVO DECK AND STAIRS AT 9323 OLYMPIC VIEW DR.
Dear Mr. Mock:
I have reviewed the above building permit application for the Planning Division, and it was
found that the following information, corrections, or clarifications will need to be addressed
before review can continue:
Property Dimensions:
1.Your site plan indicates proposed lot lines; however, these lot lines
appear to be the existing lot lines following the lot line adjustment that was recorded in
1980. Please refer to the property dimensions of Lot 1 of LL-1980-17 (see attached), and
correct the dimensions of the site accordingly. This may be redlined on your site plan.
Lot Coverage:
2.Lot coverage is defined as the total ground coverage of all buildings or
structures on a site measured from the outside of external walls or supporting members or
from a point 30 inches in from the outside edge of the eaves, whichever covers the greatest
area. Please provide a breakdown of the lot coverage calculations on the site plan,
including the footprint of the existing residence, garage, and deck as well as that of the
proposed deck and stairs. The maximum allowed lot coverage for the RS-12 zone is 35%
of the net lot area. The lot coverage calculations may be redlined on your site plan.
Please make all submittals to a Development Services Permit Coordinator, Monday through
Friday, between 8:00 am and 4:30 pm. If you have any questions, feel free to contact me at
(425) 771-0220, ext. 1224.
Sincerely,
Development Services Department - Planning Division
Jen Machuga
Planner