Loading...
09-0299 May decks.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: 5/29/2009 TO: Jeffrey and Kara May 20201 Maplewood Dr Edmonds, WA 98026 RE: Plan Check: BLD20090299 Project: Decks Project Address: same During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. Even with the stairs moved per planning letter dated May 28, 2009, the Items listed below are still applicable: 1.Identify the wood species for the 2x6 decking. 2.Identify the guard post and rail materials. 3.Identify how the welded wire mesh is secured to the guard posts and rails. 4.The handrails at the stairs are required to be graspable. Identify the material and size of handrailing. 5.Identify the stair stringer material. The stringers appear to be overspanned and will have an unacceptable amount of deflection unless a center support is provided. 6.Rotation blocking is required between the joists at the bearing beam and needs to be shown on the plans. 7.Minimum footing depth is 12” from grade to the bottom of the footing and shound be so noted on the plans. 8.Identify the material used for the bottom landing (concrete?). 9.The angled portion of the larger deck parallel to the joists seems to be missing a beam, post , angle brace or some sort of support at the side not supported by the cantilevered 6x8 beam. Show how that portion of the deck is supported. 10.At the same deck, where the 2x8 joists are cantilevered more than 36”, the joist spacing will need to be tightened up to 12” o.c. according to Table R502.3.3(1). Pat Lawler patrick.lawler@ci.edmonds.wa.us Plans Examiner 425 771 0220 x1703