Loading...
09-0316 & 0317 Plan Review Comments 2.pdfCITY OF EDMONDS - 121 5th AVENUE NORTH - EDMONDS, WA 98020 692�- PHONE: 425.771.0220 - FAX: 425.771.0221 - WEB: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT: PLANNING - BUILDING .lune 11, 2009 Phil Tiegs ptiegs@yahoo.com RE: PLAN REVIEW COMMENTS 2 FOR PLAN CHECK # 2009-0316 & 0317 NEW SFR AT 16911 TALBOT ROAD Dear Mr. Tiegs: Thank you for resubmitting so quickly in response to my previous comments. I have again reviewed the above building permit applications and found that the following information (bold underline} needs to be clarified in a written response: 1. The associated geotechnical report appears to largely satisfy the requirements of Chapters 23.40 and 23.80 of the Edmonds Community Development Code (ECDC). However, please comment generally on how the proposed project satisfies the design standards of ECDC 23.80.070.A.3, and speak specifically to the new paving which encroaches extensively into the proposed 30' geotechnical setbackibuffer. UNRESOLVED — This information has to do more with the SFR hermit and so may be submitted after the demo permit concerns are resolved. 2. On Sheet ALO, Grading and Demolition Site Plan, please show the temporary erosion and sediment control BMP(s) selected to protect the steep slope area to the east of the subject parcel, particularly since the `area of construction staging' is to be within the slope setback/buffer. UNRESOLVED — Please submit a formal erosion and sediment control plan prepared in accordance with ECDC 18.30.050 in support of the demolition permit.—The City's Engineering Division will review, and must ultimately approve, the plan before the demo permit can be issued. 3. Please verify the height calculations. Per ECDC 21.40.0303, "if a corner falls off the site, its elevation shall be the average elevation of the two points projected downward where the two sides of the rectangle cross the property line." The proposed 140.10' average grade seems to have been calculated by averaging all five points rather than averaging the off-site point first. Make any changes to the Site Plan (ALO) and Elevations (A3.0) as necessary. RESOLVED 4. Please provide a breakdown of the calculated structural lot coverage. For reference, lot coverage is defined as the total ground coverage of all buildings and structures on a site measured from the outside of external walls or supporting members or from a point 30 inches in from the outside edge of the eaves, whichever covers the greatest area. RESOLVED 5. Please identify the datum selected to calculate the height rectangle on the Site Plan, Sheet Al.0. RESOLVED You may redline your existing plans or submit three copies of your updated site plan (one reduced size) and two sets of any updated pages of the building plans. Please make all submittals to a Development Services Permit Coordinator, Monday through Friday, 8.00 am to 4:30 pm. If you have any questions, please contact me at (425) 771-0220. Sincerely, 4 "- A �4� Mike Clugston, AICP Planner