09-0506 #2 Weiner addition.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: 9/2/2009 TO: Fred Baxter and Associates 649 Fifth St. Suite 203 Mukilteo, WA 98275 RE: Plan Check: BLD20090506 Project: Weiner addition/deck Project Address: 1012 Viewland Way During review of the revised plans/documents for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit bolded Coordinator. The responses follow the original comments for #s 6,11, and 12. 1.The gravity analysis for the roof apparently did not include the tile roofing dead load. According to the notes from the EOR the roof dead load, including the tile, should be 30 psf, not 15. Revise the calculations for the beams and footings appropriately. 2.Provide beam calculations for the 8x12 deck beams. Indicate pressure preservative treating. 3.Either an additional post and footing is required, or a much larger beam for the edge of the deck supporting the walls and roof for the new dining room adjacent to the stairs, or justify with calculations the connection and loads imposed on what is apparently a cantilevered floor system. 4.Provide roof plan. 5.Provide floor joist plan in order to verify that strapping and joists will align. Using the reactions provided in the August 21, 2009 6.EOR to detail deck ledger attachment. structural Calculation package, the attachment of the ledger is inadequate with ½ inch lag screws at 16” o.c., based on the values given for lag screws in the NDS, and the available amount of ledger to install the screws. Call out the length of the screws. 7.The plans and calculations need to match, e.g. calcs for 2’x2’x10” footings call for the rebar at 8” o.c. but sheet A-2 calls out 9” o.c. 8.Sheet A4.1 labels two perpendicular sections as B-B, and the detail C cannot be found. 9.Call out and detail connections at posts to beams, beams to beams, and posts to foundation, e.g. 4x8 and 8x12 beams to 10x10 posts at deck. 10.Indicate rise and run of stairs The connection of the 11.Detail guard construction meeting the 200 lb load and 50 PSF at pickets. 4x4 Cedar guard post to the doubled rim joist is not specified in detail 6/A6.1. Could not locate 12.Complete the attached city special inspection agreement for epoxy bolts. completed city special inspection agreement. In addition to the bolded comments above: Building will not be able to complete it’s review until the planning division has approved the · plot plan. It may be necessary to make revisions due to the setback issues, and these could impact the structure. The revised structural calculation package will need to be stamped and signed by the · architect of record. Pat Lawler patrick.lawler@ci.edmonds.wa.us Plans Examiner 425 771 0220 x1703 Page 2 of 2