Loading...
09-0683 Hawkins.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: 10/21/09 TO: The Leron Co PO Box 12863 Mill Creek, WA 98082 RE: Plan Check: BLD20090683 Project: Hawkins Addition th Project Address: 9630 236 Pl SW During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1.Ledger and wood screw spacing detail (Engineering sheet #7) on the full sized plans. 2.Include a note on plans: All hardware and fasteners in contact with pressure preservative treated wood to be hot-dipped galvanized or stainless steel. 3.Engineer of record: a.Existing ceiling joist calculations-where interior bearing has been removed or altered. b.New ceiling joist calculations-ceiling joist appear to be overspanned. c.Provide a detail for the rafter to wall connection and load bearing transfer at building section A-4, right side above the walk-in-closet, and at top of wall. Include any strapping (or hurricane tie) requirements for top of rafter to top of opposing rafter for uplift. d.Engineering sheet #7-Identify length and/or minimum depth of penetration of #12 wood screws. 4.Provide flashing detail for rock veneer. 5.Show landing at storage room doors on plan view sheet 3 and section view A-4. Because the doors swing over the landing, this will need to be a flush landing (no step down). Pat Lawler patrick.lawler@ci.edmonds.wa.us Plans Examiner 425 771 0220 x1703