Loading...
09-0734 #2 Edmonds Dental Implant.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: 10/30/09 TO: Puget Sound Plumbing 4291 Aiker Road SE Port Orchard, WA 98366 RE: Plan Check: BLD20090734 Project: Edmonds Dental Implant Project Address: 22727 Hwy 99 #209 After having a phone conversation with Harry Pomeranz for clarification, read the bolded comments for the changes to the requirements. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. The piping plan and material specs are still needed. 1.Plans and specifications shall show the following in detail per UPC 1312: a.Piping layout including alarms, valves, origin of air, user outlets and intakes. b.Complete specifications of materials. This paragragh is void. 2.All medical gas and medical vacuum systems shall be supplied from a source consisting of at least two units-primary and secondary, a minimum of two compressors, and two vacuum pumps, per 1311.4 and 1325.1. Provide product data, and appropriate notes on plans. Include compressor sizes (gallon) and cfm capacities. This information is still required. 3.Medical air compressors shall be installed in well lit, ventilated, clean and accessible location. The location shall be provided with drainage facilities, per section 1325. Provide this information on the plans. The compressor product guide will provide the minimum ventilation and drainage requirements. Provide access information to the equipment room or closet. This information has been provided. 4.Provide certification agency information on the party meeting the ‘Medical Gas Verifiers Professional Qualifications Standards’ who is to provide the system verification per section 1328. Complete the attached City of Edmond’s Special Inspection Agreement. Pat Lawler patrick.lawler@ci.edmonds.wa.us Plans Examiner 425 771 0220 x1703