Loading...
1.12.18 - ENG. Correction Notice Erosion Control.pdfCITY OF EDMONDS CORRECTION NOTICE ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: January 12, 2018 PERMIT NUMBER: BLD20151266 & 1267 OWNER: Arne & Kelli Gaenz SITE CONTACT: Arne Gaenz ADDRESS: 1020 & 1024 Bell St TYPE OF INSPECTION: Erosion Control & Rip Rap Pad Inspection ❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED ❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE ® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. ❑ RECALL FOR INSPECTION ❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. ❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR With an erosion control inspection recently completed at the site, it was found that there are several concerns within the critical areas to be resolved. Follow up inspections for engineering will need to be scheduled for each of the items below. Please address the following items as soon as possible. 1. Due to the steep slopes at the site, current weather patterns and the amount of exposed soils, the city request that the geotechnical engineer of record visit the site and provide a report with their recommendations on maintaining erosion control of the steep slopes where vegetation has been removed. 2. Per plans, the riprap pad does not call for cuts into the slope. It also appears that do to cuts and placement of soils removed from the cuts, an area for water to pond has been created. Please have the geotech. of record address the cuts to the slope and possible ponding of water created at the riprap pad location and provide recommendations to be implemented if needed. 3. Please have the geotech. of record provide confirmation within the report of the orientation of the riprap pad in relation to the topography/slope is adequate as well as the placement of the stormwater outfall in relation to the riprap pad. If not adequate please address. 4. As of 1.9.19, stone has been placed of the required median size 16" up to the maximum of 24", though no minimum stone size of 4" was in place. If additional material is to be placed please call for engineering inspection when completed or if an update to the riprap pad is necessary per the geotech. of record report please install as directed. For inspection scheduling call 425-771-0220 x1326.