1.6.12 Geotech Final Approval.pdfAssociated Earth Sciences, Inc. Serving the Pacific .Northwest Since 1,981 January 6, 2012 Project No. KE100209B Wilcox Construction 234 5°i Avenue Edmonds, Washington 98020 Attention: Mr. Andrew Ouderkirk Subject: Geotechnical Special Inspection Completion Letter First Security Bank Replacement 620 Edmonds Way Edmonds, Washington City of Edmonds Building Permit # BLD2011-0158 Dear Mr. Ouderkirk: coP, j GA o-� EAmoA4s As requested, this letter summarizes our construction special inspection services completed for the project. The construction phase services were a continuation of our participation on the project which included earlier work during the design phase. Our construction special inspection services were intended to satisfy the requirements of the City of Edmonds Special Inspection and Testing Agreement (Agreement) for the project, undated, signed by Associated Earth Sciences, Inc. (AESI) on April 14, 2011. Our special inspection site visits also provided us the opportunity to observe important geotechnical engineering and surface water infiltration aspects of the project that were not included in the Agreement. SPECIAL INSPECTION SUMMARY AESI visited the site 10 times between July 15 and December 27, 2011. We observed geotechnical engineering aspects of the following tasks: • Site stripping; • Mass grading and building pad construction; • Foundation and floor subgrade preparation; • Foundation backfill and footing drain placement; • Parking lot paving subgrade preparation; • Infiltration system confirmatory infiltration rate testing. Kirkland Everett Tacoma 425-827-7701 425-259-0522 253-722-2992 www.aesgeo.com These observation tasks were completed on a part-time, and on -call basis. Each of our field visits was documented in a daily field report which was distributed to the contractor, architect, and City. Based on our observations and testing as documented in the field reports, the geotechnical and infiltration aspects of the project observed by us were completed in general accordance with project documents and our recommendations, in our opinion. We appreciate the opportunity to be of continued service. If you have any questions, please do not hesitate to call. Sincerely, ASSOCIATED EARTH SCIENCES, INC. Kirkland, Washington l� Bruce W. Guenzler, L.E.G. Project Geologist Kurt herfriman, P.E. Principal Engineer BWona M00209B2 Projects120100209"WP 2