Loading...
10.11.18 - Sewer Approval Email from LCD Corp.pdfFrom: John Murphy To: Rivera, Chris Subject: Fwd: Permit number eng20180044 Date: Wednesday, October 10, 2018 6:21:10 PM Chris, I received this response to your email from Darrell Smith. He actually called me first to discuss. I think his email should eliminate any concerns you might have regarding the sewer lift station. We will call it in for re -inspection for the backfill. If you have any questions or concerns, please let me know, Thanks John Murphy Building Company, INC 206-730-6734 Sent from my iPhone Begin forwarded message: From: Darrell Smith <dsmith(a�ldccorp.com> Date: October 10, 2018 at 4:59:55 PM PDT To: 'John Murphy' <m,murphybuilding.com> Cc: Terry Murphy <tmmamurphybuilding.com> Subject: RE: Permit number eng20180044 John thank you for phone call this afternoon and informing me of the concrete pour today around the residential lift station. From your description your company poured more than 23 cubic feet of concrete up against residential lift station and completely around the lip. With that understanding you are in full compliance with COE standard lift station grinder pump detail and the LDC report. Please also bear in mind the intent of the anchor feature is to counteract buoyant forces from ground water. It is our understanding that the geotechnical investigation at this site reported no evidence of ground water at this elevation. Therefore I have a high level of confidence your residential lift station will perform well as constructed regarding the anchor in place feature. Thanks Darrell Darrell Smith, PE Director of Civil Engineering LDC, Inc 15th Anniversary www.LDCCorp.com T 425.806.1869 Ext.140 20210 142nd Ave NE Woodinville, WA 98072 dsmith&ldccorp.com Above the Standard for 15 Years & Counting -----Original Message ----- From: Rivera, Chris[mailto:Chris.Rivera&edmondswa.gov] Sent: Wednesday, October 10, 2018 3:52 PM To: 'John Murphy' <mbcUmurphybuilding.com> Cc: Darrell Smith <dsmith _ldccorp.com>; Terry Murphy <tmmQmurphybuilding. com> Subject: RE: Permit number eng20180044 Hello All, I spoke with our utilities engineer and provided the below forwarded email as well as the original approved sewage pump design packet. A question was asked in regards to option #2 - Is the approximate 1.75" (I don't know the exact width if John or Terry could provide additional information may be helpful) circumference lip at the base of the cylinder going to be enough area for the concrete to hold on to? If it is decided to go with option #1 - We will need to know what type and size anchor would be acceptable (to LDC Corp.) for the install, prior to inspection. Please let me know what is decided. If you have any questions, feel free to contact me. Thank you, Chris B. Rivera Engineering Technician City of Edmonds 121 5th Ave. N. Edmonds, WA 98020 425.771.0220 ext. 1339 -----Original Message ----- From: John Murphy <m .m hybuilding_com> Sent: Wednesday, October 10, 2018 9:32 AM To: Rivera, Chris <Chris.Riveragedmondswa.gov> Cc: Darrell Smith <dsmith Wldccorp.com>; Terry Murphy <tmmgm=hybuildin com> Subject: Permit number eng20180044 Chris, You were out yesterday and spoke with my brother Terry. This is for the correction notice on 15716 72nd Ave West and permit number ENG20180044. We will be pouring concrete alternative method for the uplift from the email below. Please verify this email letter is enough from the Engineering firm on record. Thanks John John Murphy Murphy Building Company, Inc 6203 202nd St SW Lynnwood, WA 98036 425-775-3388 -----Original Message ----- From: Darrell Smith <dsmith(&,ldccorp.com> Sent: Wednesday, October 10, 2018 8:29 AM To: John Murphy <mbc(�murphybuildin,g com> Cc: Terry Murphy <tmmamurphybuilding.com> Subject: RE: O'Neal Project The concrete pad you have poured/described is more than sufficient to counter act any potential buoyant forces. The LDC spec sheet required 23 cubic feet concrete (3,334lbs) and you have installed 72 cubic feet of concrete (10,476lbs). So attaching your sump by installing 4 concrete foundation anchor bolts should satisfy the city inspector correction notice. I would however run this solution past the city before beginning. Alternatively you could pour 23 cubic feet concrete around the base of the sump. Feel free to call me if you have any questions. Thanks Darrell Darrell Smith, PE Director of Civil Engineering LDC, Inc 15th Anniversary www.LDCCoM.com T 425.806.1869 Ext.140 20210 142nd Ave NE Woodinville, WA 98072 dsmith( Idccorp.com Above the Standard for 15 Years & Counting -----Original Message ----- From: John Murphy [mailto:mbc(i�murphybuilding com] Sent: Wednesday, October 10, 2018 8: 10 AM To: Darrell Smith <dsmith(gldccorp.com> Cc: Terry Murphy <tmrn&murphybuilding.com> Subject: Re: O'Neal Project The contract was with the homeowner Donald O'Neal. I have the contract at the office and can get your job file number if you need. The width and length of concrete pad is 8 1/2 ` x 8 1/2' and the depth was 12" thick. Thanks John Sent from my iPhone On Oct 10, 2018, at 7:56 AM, Darrell Smith <dsmithnl�ccorn com> wrote: Can you refresh my memory on who LDC had a contract with for this project? Thanks Darrell Darrell Smith, PE Director of Civil Engineering LDC, Inc 15th Anniversary 1121111111 IN T 425.806.1869 Ext.140 20210 142nd Ave NE Woodinville, WA 98072 r'I �Mrl • anwoorl • • • Above the Standard for 15 Years & Counting From: John Murphy [mailto:mbc cr,murphybuilding coin] Sent: Tuesday, October 09, 2018 5:30 PM To: Darrell Smith <dsmith(a�ldccorp.com> Cc: Terry Murphy <tmm(omurphybuilding.com> Subject: O'Neal Project Hi My brother spoke to you today regarding the O'Neal project. Attached are pictures from the site with the correction notice. Basically, the inspector wants to know how high and how much concrete around the base for potential uplift. Their standard detail is attached as well. We have poured 1 foot thick concrete pad underneath already as you can see from picture. Thanks for your help John Murphy 206-730-6734 Sent from my iPhone Begin forwarded message: From: "John Murphy" <mbc murphybuilding.com<mailto:mbc2,murphybuilding com» To: "John Murphy" <mbc&murphybuiIding. com<maiIto 7mbcamuMhybuilding.com>>, "Terry Murphy" <tmm&murphybuilding. com<mailto:tmmnmurphybuilding.com>> [cid:image001.jpg@O1D4606E.B39F5620] [cid:image002.jpg@O 1 D4606E.B3 9F5620] [cid:image003.jpg@O 1 D4606E.B3 9F5620] [cid:image004.jpg@OID4606E.B39F5620] Sent from my iPhone <image001.jpg> <image002.jpg> <image003.jpg> <image004.jpg>