Loading...
10.18.2018 Correction Notice.pdfCITY OF EDMONDS of EDAf0 CORRECTION NOTICE ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov �St. 1890 PERMIT DATE: October 18, 2018 NUMBER: PLN20110008 OWNER: Mike Cook SITE CONTACT: Mike Cook ADDRESS: 7416 176th St SW TYPE OF INSPECTION: FINAL INSPECTION ❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED ❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE ® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. ❑ RECALL FOR INSPECTION ❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. ❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR 1. Remove honey bucket from right-of-way 2. Remove filter socks from catch basins 3. Remove debris from catch basins 4. Replace fog line across asphalt patch. Tape is not acceptable. 5. Cover exposed soils — bark is acceptable. 6. Place quarry spalls on almost vertical cut (at storm stub marker off Soundview) 7. Provide electronic asbuilt For inspection scheduling call 425-771-0220 x1326. Page 2 of 2