Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
100022322 Permit App.pdf
_141C..I squ. -ROW PERMIT NO.: ENG_ d l 0_4) ��3-Z z ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: Y. �P `� 1 \ V� Q\C,1y� CONTACT: v4C, iA►L�� Sf CONTRACTOR: Phone #: Mailing Address: �O � x b—t Mk N . Fax #: . State License #: J�y�� 1�5Q cLv � UA , Email #• . �t--tt K., N! QNS-Vt�Q;,jnoQjo.6 City Business License #: ❑ Liability Insurance ❑ Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City project Traffic Control (Only) ❑ Multi -Family. ❑ Single Family E] Other El EUC (PUD, VFP.JZON, pSE, COMCAST, OVWSD): Is.this permit part of a blanket permit ❑ Yes. No ANY ASSOCIATED PERMITS? BLD# ENG# DESCRIPTION OF PROPOSED WORK.(Be Specific): (B �- ��� 3 PV, Cc- T S O 31Q v� u WAS STREET OVERLAYED WITHIN THE LAST FIVE 5) YEARS? YES.❑ NO. ❑ Year: PAVEMENT CUT: ❑ Yes W No Hyes, indicate size of cut:. CONCRETE CUT: ❑ Yes [ 'No. If yes, indicate size of eut: '. x RIGHT-OF-WAY DURATION AREA TOTAL (NUMBER OF MONTHS) CLOSURE Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X JLF SF Parking 72 Hrs + LF X SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their 'possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE 6 DATE Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE ORUAD N ION AHEAD 01) , SEE TNOTE 1 ONE LANE ROAD AHEAD (w3D,-4) SEE N❑TE 1 (w230' a) SEE 1 i 70P TABLE A SPEED (MPH) TAPER LENGTH (FT) CONE SPACING ALONG TAPER (FT) OFFSET WI➢TH 10' 12' 25 100 120 25 30 150 180 30 35 200 240 35 40 270 320 40 45 450 540 45 NOTE: 1. DISTANCE BETWEEN SIGNS SHALL BE 100' FOR RESIDENTIAL STREETS (25 MPH), AND 200' FOR ARTERIAL ROADWAYS 2, FLASHING BEACON SHALL BE INSTALLED AT EACH SIGN FOR NIGHT—TIME USE. 3. DISTANCES MAY VARY AS APPROVED BY THE ENGINEER. 4. FLAGGERS REQUIRED TO CONTROL TRAFFIC WHENEVER THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE WORK SITE WITH MATERIALS -OR EQUIPMENT. LEGEND: O CONE OR CHANNELIZING DEVICE (SEE STD 7-14) y 1 WORK -AREA aL-\o.1S TRUCK WITH >� FLASHING OWITH BEACON R mr TAPER LENGTH (TABLE A) I + SEE NOTE 1- SEE NOTE 1 SEE NOTE 1 a I KHr r ll� I,UIN I KUL. rL-HIN 2 LANE ROADWAY: ONE LANE CLOSED WITH ALTERNATING ONE—WAY TRAFFIC AND FLAGGERS (w20_7 A) ONE LANE ROAD AHEAD (w20-4) 30, &(w,2,G— t ) 30' McAllister, Mary From: Rivera, Chris <Chris.Rivera@edmondswa.gov> Sent: Friday, April 22, 2016 11:56 AM To: McAllister, Mary Subject: RE: 3 PHASE OH TRANSFORMER BANK Mary, As long as the power provided to the site is not overhead this would be acceptable. Any questions, let me know. Thank you, Chris B. Rivera Engineering Technician City of Edmonds 425.771.0220 ext. 1339 From: Rivera, Chris Sent: Friday, April 22, 2016 6:48 AM To: 'McAllister, Mary' Subject: RE: 3 PHASE OH TRANSFORMER BANK Mary, Just waiting on a response, it seems it may be ok, though just need to confirm. Thank you, Chris B. Rivera Engineering Technician City of Edmonds 425.771.0220 ext. 1339 From: McAllister, Mary [mailto:MMMcAllisteKcbSNOPUD.com] Sent: Thursday, April 21, 2016 4:23 PM To: Rivera, Chris Subject: 3 PHASE OH TRANSFORMER BANK Hi Chris, Did you buy chance get an answer to allowing changing a single transformer out to a 3 phase oh transformer bank for Campbell Nelson? Thanks, Mary Mary McAllister Senior Designer 1 POLE 269852 CHARGE TIME TO W08100012360 PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY LOCATION 24015 84TH AVE W ED SOUTH COUNTYAREA POLE No. 4-269852 SW1/4S 31 T 27 R 04 DATE 8/21/17 W.O. NO. 100022322 REASON FOR WORK INSTL UG 3PH SEC RISER PED ENGINEER MCALLISTER TASK 60 FOR CAMPBELL NELSON DRAFTER U.G. NO. 69 KW CONN LD SCALE NTS APPROVED & DATE PRINTED DATE WORK COMPLETED FOREMAN FEES REQ'D ■ YES ❑ NO PRIMARY OVERHEAD ❑ RESIDENTIAL ❑ COMMERCIAL LEO NO. @$ _$ 42weni[Z 4welm aim9 BASIC FEE g ` La _$ PERMITS (DATE GRANTED) METER/CONY. POLE g ❑ TREE TRIM PRIMARY UNDERGROUND ❑ STATE ❑ RESIDENTIAL ❑ COUNTY ❑ COMMERCIAL ■ CITY BASIC FEE S LEU NO. EASEMENTS @$ _$ ❑ REQUIRED ■ NOT REQUIRED SECONDARY UNDERGROUND BASIC FEE g 1@$ =$ DATE RELEASED UNDERGROUND PLAT FOREIGN CONTACTS ❑ JPN# BASIC FEE g FT.@8 '=$ ❑ JOINT TRENCH FRONTIER & CATV ❑ JOINT BORE FRONTIER & CATV STREET LIGHTING ■ N/A FT.0 =$ POLE STENCILING WORK IN RIGHT OF WAY FROM TO ❑ PRIMARY TAKE OFF POLE ❑ SECONDARY CL FT. Lag '=$ PRE-CONST. REQUIRMENTS ❑ TREE TRIM ❑ PUD LOCATOR MISCELLANEOUS FEES ❑ BACKHOE ■ FLAGGING VAULT g ■ ONE CALL DATE PERMIT g No. COST EST g 5,663 STREET LIGHTING g ❑ YES ■ NO g READY PHASING g GIS WORKING TOTAL DUE g 566314.4 DATE PAID 10/5/1] 1 LINE FINISHED POLE/ XFMR RECEIPT NO.1800009759 JOINT USE SERVICE ORDER NO. LOCATION MAP PAGE 474 J-3 I FC,FNn: O EXISTING POLE X EXISTING POLE -TO BE REMOVED • NEW POLE NEW POLE TO REPLACE EXISTING POLE DATE SUBSTATION RPK CIRCUIT NO. 5217 PHASE 1.2.3 ENGR'S TEL. # 425-670-3216 ENGR'S CELL # 425-501-1254 240TH ST SW 25KVA 75KVA N e 25KVA AFTER SCHEMATIC 240TH ST SW 3 RMV GIST XFMR 075-399215 SER• HANG A 1201240 7200V 25KVA XFMR 25- SEC VOLT / SERO RE -HANG A 120/240 7200V XFMR 75-399215 IN CENTER POS SEC VOLT l SERG HANG A 120/240 7200V 25KVA XFMR 25- SEC VOLT SERO OPOLE 269852 CHARGE TIME TO W08100020742 INSTL UG SEC RISER PEO ASSY 1U705 AND XLARGE PED V0104 34' SE AS STAKED WITH W/4 151 BAR SEC CONN RUN 34' OE 350 AL UG SEC QUAD IN EXISITNG 4" PVC FROM 3 XFMR BANK TO PED 2 REFE4 TO T&D GUIOLINE 4-13-8.0 FOR WIRING 120/240V 3-WIRE gh 75KVA 2 BEFORE 1 & 120/208V 4-WIRE 3PH SERVICE FROM ONE 3-PH BANK RPK 240TH ST sw N L-STI106180- 12 ,04-269852 ExIINGGLE LE 120 " PED � SO 5217 75-399215 © P SHUST 1 NEW XLRG PED 3 120/208 3PH �> > co 24015 JAL-7396-Y�0 i �a a� E SL-ClUSToz 0 a 7 ++ dU 00 �o SHEET OF Imo