1001 Maple St., Edmonds - LPG (3).docx
CITY OF EDMONDS
DEPARTMENT OF FIRE PREVENTION
MEMORANDUMAugust 17, 2018To:Jeff HartFrom:Katherine Baker, Deputy Fire Marshal – 425-775-7720 – kbaker@southsnofire.orgRe:Plan Check of Permit # BLD20180426Address:1001 Maple Street,
EdmondsProject:LPG Tank InstallationScope:Two 120 gallon, above ground tanksThank you for the additional information Mr. Hart. It would appear from the pictures and your written description
that the setback distances are met with one exception, that being placement below the bedroom window. I have added the required distances for each item below.Locations of all openings,
to include doors, windows, direct vents for appliances, and mechanical ventilation air intakes if applicable.(Maintain a minimum distance of 5 feet horizontally from the containers
and their pressure relief devices.)Tank fill connections and pressure relief devices in relation to location of exterior ignition sources if any.(Maintain a minimum distance of 10 feet
horizontally.)Location of tank fill connections and any liquid-level gauge vent if present.(Maintain a minimum distance of 10 feet horizontally from direct vents for appliances, and
mechanical ventilation air intakes if applicable.)Distance from containers to the property line.(Maintain a minimum distance of 5 feet horizontally from the containers.)Please feel
free to contact me with any questions.