10-0270 Plan Review Comments.pdf
CE
ITY OF DMONDS
th
• 1215 AN•E,WA98020
VENUEORTHDMONDS
P: 425.771.0220 • F: 425.771.0221 • W:www.ci.edmonds.wa.us
HONEAXEB
DSD: P•E•B
EVELOPMENT ERVICES EPARTMENTLANNINGNGINEERING UILDING
April 22, 2010
Darryl B. Wood
Wood Construction
21916 Calhoon Road
Monroe, WA 98272
RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2010-0270
TH
ROSENBERRY DECK APPLICATION, LOCATED AT 17122 – 68 AVE. W
Dear Mr. Wood:
I have reviewed the above building permit application for the Planning Division, and it was found
that the following information, corrections, or clarifications will need to be addressed before review
can continue:
Setbacks:
1.The RS-20 zone requires a minimum side setback of 10 feet on each side with a
total of 35 feet between the two sides. You provided the distance between the deck and the
southern property line as 15 feet. In order to confirm that the proposal complies with the
minimum required setbacks, please also provide the distance from the northernmost wall of the
residence to the north property line. If the sum of this distance plus the proposed distance from
the deck to the southern property line is less than 35 feet, then the deck will need to be reduced
in size in order for these setback distances to add up to a minimum of 35 feet.
Lot Coverage
2.: Lot coverage is defined as the total ground coverage of all buildings or
structures on a site measured from the outside of external walls or supporting members or from
a point 30 inches in from the outside edge of the eaves, whichever covers the greatest area.
Please provide lot coverage calculations on your site plan. Note that the lot coverage
calculations must include the areas of the footprint of the existing residence, proposed deck,
garage, shed, and any other existing or proposed structures. Please provide the total lot
coverage in square feet and as a percentage of the lot area. The maximum allowed lot coverage
for the RS-20 zone is 35 percent of the net lot area.
Please make all submittals to a Development Services Permit Coordinator, Monday through Friday,
between 8:00 am and 4:30 pm. If you have any questions, feel free to contact me at (425) 771-0220,
ext. 1224.
Sincerely,
Development Services Department - Planning Division
Jen Machuga
Planner