Loading...
1010_001.pdfHANBY CONSTRUCTION CO., INC. 114 Second Ave. S. Suite 102 • Edmonds, WA 98020 . (425) 672-8233 fax (425) 672-3245 HANBYCC144B4 Mariner Plaza 114 Second Ave S Edmonds, WA 98020 RE: Replace Foyer Windows Dear HOA: We want to thank you for the opportunity to submit an estimate for the above referenced project. Based upon our inspection of the site and analysis of project conditions, the scope of work is as follows. Demolition. A. Layout, cut and remove siding surrounding window, to allow access to nail fin. B. Cut and remove portion of interior window liner (note: part of existing window assembly) C. Remove window. General Construction A. Load and deliver Hanby scaffolding from storage to site including return and storage after completion of work. B. Erect and disassemble (after completion of work) scaffolding. C. Pick up materials and to for window installation. D. Unload new windows upon delivery. Rough Carpentry. A. Furnish and install flexible flashings at window opening integrating into existing vapor barriers. Includes metal flashing above window at new window trim. B. Furnish and install new windows. Finish carpentry. A. Furnish and install new exterior trim. B. Furnish and install new interior wood trim as needed. Painting and finishing. A. Prime paint new wood at both exterior and interior. B. Caulk, spackle, sand and paint exterior and interior trim. April 16, 2019 Mariner Plaza Foyer window Page Two INCLUSIONS: A. Jobsite supervision and coordination B. Clean up removal and debris C. Labor taxes D. Contractor's overhead and profit EXCLUSIONS: A. Architectural and engineering fees B. Building permit application or fee C. Builder's all risk insurance D. Repairs due to unforeseen conditions E. Project management cost associated with permitting, verification of existing conditions and placement of window order Hanby construction Company INC. respectfully submits the following estimate: $ 30,775.00 (Thirty Thousand Seven Hundred Seventy -Five dollars and 00/100), excluding Washington state sales tax. This estimate is based upon our best judgment and interpretation of the existing conditions and project requirements. ---We look forward to working with you to refine the -scope of work and meeting -your -budget requirements. Let us know if you have any questions and concerns. Very truly yours, HANBY CONSTRUCTION CO, INC. Ross Hanby Estimator 13. Permits, Fees and Notices. Unless otherwise provided herein, the Owner shall secure and pay for the building permit and for all other permits and governmental fees, licenses, and inspections necessary for the proper execution and completion of the Work. 14. Registration as Contractor. The Contractor warrants to the Owner that it has a valid and current certificate of registration as a general contractor from the Washington State Department of Labor and Industries, and that it will maintain such registration together with the surety bond as required by law until completion of Work as set forth herein. IN WITNESS THEREOF, the parties hereto have executed this Contract by their duly authorized officers the day and year above written: Owner: a By: Contractor: Printed Name:, Printed Name: k' Its Its: P0,E510 E Dated: Dated: AP Q.- AGREEMENT AMONG PARTIES On behalf of Mariner Plaza Home Owners Association (also known as Mariner Plaza Condominium Owners Association), the undersigned, as President of said Association, affirms that the. Association, as Owner, has agreed to enter into a Construction Agreement with Hanby Construction Company, Inc., as Contractor, pursuant to the Construction Agreement executed by both Parties dated April 29, 2019, including any and all Attachments and Exhibits thereto. MARINER PLAZAN HOME OWNERS ASSOCIATION MARINER PLAZA CONDOMINIUM OWNERS ASSOCIATION 91-71 d?e14-) 'ee B H Cleveland Its President Dated May 6, 2019 Edmonds, WA 98020