During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to Marie Harrison.
Technical Storm Water and TESC Memorandum
1. Please clarify the conditions/assumptions concerning the change in pervious pavement (now
impervious).
2. The assumption that runoff from all grass areas will infiltrate completely onsite is invalid. The
standard calculation methods must be used to determine contribution to the Regional infiltration
system and a fair share of the cost of this system must be paid to the appropriate City funding
source.
3. The sediment trap is found to be acceptable.
104th Ave W-23700_W20080452_01d Woodway Park