Loading...
104th Ave W-23700_bld20080452_Old Woodway Park.pdfof ED V CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION �sr 1g90 (425) 771-0220 City Website: www.ci.edmonds.wa.us DATE: July 23, 2008 TO: Pamela Lemcke lemcke@ci.edmonds.wa.us FROM: Don Fiene, Storm Water Engineer fiene@ci.edmonds.wa.us RE: Application #: bld2008O452 Project: Old Woodway Elementary School Park Project Address: 23700 104a' Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Marie Harrison. Technical Storm Water and TESC Memorandum 1. Please clarify the conditions/assumptions concerning the change in pervious pavement (now impervious). 2. The assumption that runoff from all grass areas will infiltrate completely onsite is invalid. The standard calculation methods must be used to determine contribution to the Regional infiltration system and a fair share of the cost of this system must be paid to the appropriate City funding source. 3. The sediment trap is found to be acceptable. 104th Ave W-23700_W20080452_01d Woodway Park Page 1 of 1