Loading...
106336160-1020 Bell St.pdf61_t of E VA,10 'IivC , ggo ROW PERMIT NO.: ENG ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: 106336160 CONTRACTOR: PSE/Infrasource CONTACT: Sue Sidick Phone #: 425-457-6353 Mailing Address: 1660 Park Lane, Burlington, WA 98233 Fax #: State License #: INFRASL871C2 City Business License #: NR-023614 Email11: Susan.Sidick@pse.com ❑ Liability Insurance ❑ Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: 1020 Bell St ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family N Single Family ❑ Other ❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ❑ Yes No ANY ASSOCIATED PERMITS? BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : Work area is approx 5' S - 15' S c/1 of Bell St & 465' W & 441' W c/I of Olympic Ave to install gas service 1 3x5 asphalt/ grass anticipated and 1 3x4 dirt cut anticipated. WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑ Year:1062i PAVEMENT CUT: ® Yes ❑ No If yes, indicate size of cut: 3 x 5 CONCRETE CUT: 0 Yes ❑ No If yes, indicate size of cut: x RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF SF LLFX Parking 72 Hrs + X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be vrkalid. s Susan Sidick 2/28/2018 SIGNATURE Dace: soco.oeao o�s�ao-0roo• DATE Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Job #: Date: Jurisdiction: ROW Permit: Est. Start Date: Est. Duration: 106336160 2/16/18 Edmonds Yes 4/23/18 Puget Sound Energy Gas Pre -Inspect Form Address: 1020 bell st City / Zip: EDMONDS, 98020 Customer: Kell! Gaenz 425-478-6068 PM / Inspector: Kevin Williams 425-691-7573 From 1-1/4 PE main run new complete 1-1/8 PE service to single family residence( 25' scat stub New r onscructlon: with 35' plat extension) set AC-630 OR @ Inches. Also C&C 1/2 STW stub @ Main. Yes Construction Method Scat ROW / Plat Provert PLAT Map: 163,067 N _ } Fire Hydrant Water 1-1/4 PE in V 5 CL20 ® ®! ® m- Sewer ..,® W u 20 STW Main 1NS _ 5 P/L, : 1I .,. I12°STW , ;.._. II 11 11 I1 Stub i I II 0Z01 P/L PIL _ Work Location Size of Cut Surface Type 5' S of CL Bell ST & 465' 1 W I of CL 10lyMpiCAVE 3x5 Asphalt/ Grass 15' S of CL Bell ST & 441' W of CL Olympic AVE 3x4 Dirt of CL & of CL Service Information Street Information Job Type Diameter: 1-1/8" PE Flaggers #: Arterial: New Residential Svc EFV: 1-1/8" - 2600 - 9999144 Police #: TCP: Yes PUGE7 ENERcov Meter: A630 Speed Limit: 25 No Parks #: 6 Meter Loc: Trolley Lines: Mtr Hoods #: Del Press: 6" W.C. Traffic Signal: Bus Stop: Bollards: 2.5" # 1 1 4" # I ADA Ramps #: Route #'s: 1� RESIDENTfS) WILL BE INFORMEDOFPOSSIBLE TEMPORARYDRIVEWAY CLOSURE LEGEND ® 18�TRtfFlC C0.;E ® eo W � Tac�Ttcaov Tt w m Twaact4tar: sxa+iocpTwv MINIMUM TAPER LENGTH= L ftel) WaE �41OTM POSTED SPEED DMfTS _ 20 25 30 35 40 45 10 70 WE 150 205 295 475 11 75 115 185 225 295 495 12 80 125 180 245 320 540 PUGET SOUND ENERGY Job#106336160 1020 BELL ST, EDMONDS, WA February 28, 2018 Sheet 1 of 1 gregory.harwood@pse.com (425) 424-6425 Roll St 1020 Bell Street Nellle Einin VICINITY MAP Notes: 1. All signs and spacing to conform to the MUTCD and City of EDMONDS standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise Indicated. 3. ChannelizIng devices are 28'traffic cones. 4. Sign size can be a minimum of 48' x 48' and shall not obstruct pedestrian 5. access. Crew is required to leave a minimum of 11' for traveling lane width. CHANNELIZATION SIGN SPACING 6. Alert affected residents and businesses. DEVICE SPACING 'x' 55+ 7. Work to take place between 9 a.m, and 4 p.m. TANGENT TAPER MPH eoo so155 B. Contractor shall post temp'NO PARKING' 72 hours prior to constmed 8D 40 55f7O 500' mY 45/55 3W40 9. Work areas will be 465' WCL of OLYMPIC AVE & 5' SCL of BELL ST, and 60 30 35/45 2W 30 441'WCL of OLYMPIC AVE& 1& SCL of BELL ST. 40 1 20 125130 1W 25 PLAN PREPARED BY: TRAFFIC MANAGEMENT, INC. 809.763.3999 vavw.UafScmanapementaom �( T,aifr dSam<e •5:ka8 Rxsuh TMI C31 Csssd<eg�FaareeiyTrirmg C31 786804— TNICONTACACTPE1872 NaFaa3naeesao TcscERra aDiezz PLAN ORDER: 33985 DATE Waaoie-RN