Loading...
106339921-611 Alder st_.pdfnF EVA,1(-), -,NC. 1 s`) u ROW PERMIT NO.: ENG ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: 106339921 CONTRACTOR: PSE/Infrasource Mailing Address: 1660 Park Lane, Burlington, WA 98233 State License #: INFRASL871 C2 City Business License #: NR-023614 CONTACT: Sue Sidick Phone #: 425-457-6353 Fax #: Email #: Susan.Sidick@pse.com ❑ Liability Insurance ❑ Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: 611 Alder St ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑X Single Family ❑ Other ❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit9 ANY ASSOCIATED PERMITS? ❑ Yes ® No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : Work area is approx 5' N c/I of alleyway & 132' E c/I of 6th AVE S to install gas service (1) 3x5 cut in grass anticipated WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑ Year: 1063; PAVEMENT CUT: CONCRETE CUT: ❑ Yes ❑ No ❑ Yes ❑ No If yes, indicate size of cut: 3 If yes, indicate size of cut: x5 x RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. Susan-1 1- sp.d by P,1111 5/16/2018 I d I cK DN at=Susan Sidi[k o=Pen@in DepaNnUS ou=Muniapal SIGNATURE Re1a��nn= emn��-=��=an=3 0700=e�nm �-�s DATE Dena: 2018.05 � 8 13:3� 23-0�'00' Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Job #: Date: Jurisdiction: ROW Permit: Est. Start Date Est. Duration: 106339921 5/7/18 Edmonds Yes 7/23/18 Puget Sound Energy Gas Pre -Inspect Form Address: City / Zip: Customer: PM / Inspector: 611 ALDER ST EDMONDS, 98020 DAVID OLSEN 206-409-9365 Kevin Williams 425-691-7573 Job Description / Scope of Work From 2" PE main in alley run new complete 1-1/8 service to single family residence(7' scat stub New Construction: No with 35' scat extension) set Construction Method All Scat / Trenchless PLAT Map: 163.066 t N 3 1 2" PE Main 920762 i Alley I P/L I 118" PE o W ^ I 611 LU a r I I I I I I I Water Alder ST I — — — — — — — — — — — — — — — — — — — — — — — — — — 1 — — — — — — — — — — — — — — — — - sewer EOM I I I Work Location Size of Cut Surface Type 5' N of S PL Alley & 132' 1 E I of CL 16thAveS 3x5 Gravel of CL & of CL of CL & of CL Service Information Street Information Job Type Diameter: 1-1/8" PE Flaggers #: Arterial: New Residential Svc EFV: 1-1/8" - 2600 - 9999144 Police #: TCP: Yes PUGET ENERGY Meter: Speed Limit: 25 No Parks #: 6 Meter Loc: Trolley Lines: Mtr Hoods #: Del Press: 6" W.C. Traffic Signal: Bus Stop: Bollards: 2.5" # 1 1 4" # I ADA Ramps #:1 1 Route #'s: � I � , I � , I � , I I I � , I � , I � I I-------------------- a8 e b� r- - - - - - - - - - - - - - - MAPLE ST 3HV 43S010V I I I 19 19 Cf) ALLEY I I I I I I I I I I I I • _-_---_-_--- I I I I I I RESIDENT WILL BE INFORMED OF ALLEY CLOSURE 10 DAYS IN ADVANCE. CREW CAN MOVE (SHIFT) 'moo CONES AND EQUIPMENT IN THE EVENT OF EMERGENCY 1 o o VEHICLE ACCESS. W20-3 #611 I , � I I ALLEY � I I CLOSED I AHEAD ALDER ST _______________ d000101�6� 1 _ J -____________________________________________----------- a -------�9�10°11��19��99�1��1��--------------------------- ---------------------------- ---------- I I I i I I I I I I I I I I I I I I I I I I CHANNELIZATION DEVICE SPACING MPH TAPER TANGENT 55/70 40 80 35/45 30 60 25/30 20 40 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 LH � I I I I I I I I I I I I I I I I I I I _________________________ d �000����0�0000�00� ---------------------- '1PI110000001000r l ! II , Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m 8. Work area will be 5' SPL of Alley & 132' ECL of 6th Ave S. 9. If used, place NO -PARK signs 72 hours in advance of the day that the work is to be done. a3SO10 A311Vd r'll I , I I I I p I I� ALLEY CLOSED AHEAD I I I ----- PUGET SOUND ENERGY ikjo# 106339921 611 Alder St Edmonds, WA 98020 5/15/2018 safaa.neema@pse.com (425) 398-6077 Sheet 1 of 1 LEGEND ® 28" TRAFFIC CONE ® WORK PIT TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS SIGN LOCATION RIGHT OF WAY ROW ROW