Loading...
106341680-19304 80 AVE W.pdf0 \:L L?,11(7. -,NC. 1 s`) u ROW PERMIT NO.: ENG ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: 106341680 CONTRACTOR: PSE/Infrasource Mailing Address: 1660 Park Lane, Burlington, WA 98233 State License #: INFRASL871 C2 City Business License #: N R-023614 CONTACT: Sue Sidick Phone #: 425-457-6353 Fax #: Email #: Susan.Sidick@pse.com ❑ Liability Insurance ❑ Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: 19304 80 AVE W ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑iC Single Family ❑ Other ❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ANY ASSOCIATED PERMITS? ❑ Yes ® No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) • Work area is approx 180' N C/I of Sierra Dr & & 14' E - 14' W c/I of 80th AVE W to install gas service (1) U5 gravel cut anticipated and (1) concrete cut anticipated. WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑ Year: 1063 PAVEMENT CUT: CONCRETE CUT: ❑ Yes ❑ No ❑ Yes ❑ No If yes, indicate size of cut: 3 If yes, indicate size of cut: _ x5 x RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. -1 1 - Digiie signed ,d Suse ,1111 /��/LO Susan Id IcK DNtl'Susan Sidi[k,=di,nitlin DepaNnUS ou=Muniapal SIGNATURE RD1b. nn= emn210'1'24308 0700 �nm �-Ds DATE Deia: 2018.06 20 12:43:08-0�'00' Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com N4`d3Hb' p �ibOM adoa X PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN 300 FEET OF WORK AREA x ROAD WORK � AHEAD N oOvJ3 MOM avow OV3HV X N GVGid 3NV13N0 N Y X o ■�i• D X #19304 RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE SIERRA DR N a Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m 8. Work area will be 180' NCL Sierra Dr. & 14' WCL 80th Ave W. 9. If used, place NO -PARK signs 72 hours in advance of the day that the work is to be done. PUGET SOUND ENERGY JOB# 106341680 19304 80th Ave W Edmonds,WA 18th June,2018 prachi.joshi@pse.com (425) 424-6425 1A1ST ST SWARni/F SHEET 2 of 2 �2 => 10'V b�9 D MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 20 25 POSTED SPEED (MPH) 30 35 40 45 50 55 60 10 70 105 150 205 270 475 500 550 - 11 75 115 165 225 295 495 550 605 660 12 80 125 180 245 320 540 600 660 720 LEGEND ® 28" TRAFFIC CONE BORE PIT TRAFFIC FLOW FLAGGER WORKVEHICLE/ FLASHING LIGHTS SIGN LOCATION RIGHT OF WAY ROW ROW CHANNELIZATION DEVICE SPACING MPH TAPER TANGENT 55/70 40 80 35/45 30 60 25/30 20 40 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com �CIV71HVpom \aVON X PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN 300 FEET OF WORK AREA X ROAD WORKCN o AHEAD *<CIVIH' oNMom voa. D #19304 7 RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE SIERRA DR �a Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m 8. Work area will be 180' NCL Sierra Dr. & 14' ECL 80th Ave W. 9. If used, place NO -PARK signs 72 hours in advance of the day that the work is to be done. PUGET SOUND ENERGY JOB# 106341680 19304 80th Ave W Edmonds,WA 191.RT .ST .SI/1/ ARni/F MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 20 25 POSTED SPEED (MPH) 30 35 40 45 50 55 60 10 70 105 150 205 270 475 500 550 - 11 75 115 165 225 295 495 550 605 660 12 80 125 180 245 320 540 600 660 720 18th June,2018 prachi.joshi@pse.com (425) 424-6425 SHEET 1 of 2 CHANNELIZATION DEVICE SPACING MPH TAPER TANGENT 55/70 40 80 35/45 30 60 25/30 20 40 Job #: Date: Jurisdiction: ROW Permit: Est. Start Date Est. Duration: 106341680 6/15/18 Edmonds Yes 8/20/18 1-112 Days Puget Sound Energy Gas Pre -Inspect Form Address: City / Zip: Customer: PM / Inspector: 19304 80TH AVE W EDMONDS, 98026 TREVE HAIST 206-683-5200 Jordan Cooper 425-623-5302 Job Description / Scope of Work From 2" STW IP 14' E ( 5226-1963) Run Scat PE 1 1/8 Service To Single Family Home 75' (40' New Construction: Stub & 35' Ext) and Set A250 OR. Please see Attached City Of Edmonds GIS Map Construction Method All Scat / Trenchless PLAT Map: 161069 P/L I A250 MSA ® 1-1/8" PE I I I l I 19304 I I II I I :l I I I P/L I II I II I II 6" EXISTING Sewer 6" EXISTING Water 3 I I d I 24" CMP EXISTING Storm L L� 00 ..................:............................:............... ...... ...:... ...;... ;...... .........:............. .. ... .. ... ..................:.........;...................:....... ...... . . . . . . . . . . Sierra Dr . . . . . . . . . . . . . I I I Work Location Size of Cut Surface Type 180' N of CL Sierra Dr & 14' E of CL 80th Ave W 3x5 Gravel 180' N of CL Sierra Dr & 14' W of CL 180th Ave W 3x5 C Of CL I & of CL Service Information Street Information Job Type Diameter: 1-1/8" PE Flaggers #: Y Arterial: N New Residential Svc EFV: 1-1/8" - 2600 - 9999144 Police #: N TCP: Y PUGET SOUND ® ENERGY Meter: A250 Speed Limit: 25 No Parks #: Y Meter Loc: 08 - OR Trolley Lines: N Mtr Hoods #: N Del Press: 6" W.C. Traffic Signal: N Bus Stop: N Bollards: 2.5" # 1 1 4" # I ADA Ramps #:I N I Route #'s: I N