Loading...
107053987.pdf THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 3/29/173/30/17 DATE 1/2 ....PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG 107053987 EDMONDS 107053987 N office 425-495-4465425-424-6426425-424-6549425-495-4465N/AN/AN/A PHONE NO PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. 1"=20' MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY 206-321-8089 INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY Owner / Developer Contact Info For contacts below dial 1-888-CALL PSE (225-5773) PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS PERMIT NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. SCALE DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED Scale: NONE COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. TYP. UTIL. CROSSING SECTION SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND A.BAUNSGARDA.BAUNSGARD G.VUKOSAV STANDARD GAS CONSTRUCTION NOTES:CONTACT D.DAO NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. JULIE LYNN-HANSON REAL ESTATE/EASEMENT N/AN/AN/A JULIE LYNN-HANSON EDMONDS, WA 98020 RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. N/A 1045 2ND AVE S Vicinity Map 2" MPE IP MAIN EXTENSION (2 LOTS) PROJECT MGRAPPROVED BY CP APPROVAL WORK JOINT FACILITIES ARRANGEMENTS CHECKED BY 1045 2ND AVE S, EDMONDS, WA 98020 CLEARANCE SITE ENGR - GAS GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. 1' MIN. DRAWN BY JULIE LYNN-HANSON FUNCTION 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.MAPPING ATTN: N/A ___________________________, PHONE______________. Manufacturer THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. TESTED BYTESTED BY WATERWATER N/AN/AN/A 107053987106322898 SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG CSPBTGPM Order #164.065 GAS WK CTR TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 45 NITROGENNITROGEN PLAT MAP Act Lgth GAS MAIN INSTALLATION/RETIREMENT --------- FF 45 PSIG GAS MAIN PRESSURE & TESTING PP DESCRIPTION OPERATING STANDARD 2525.2500. Est Length BOX (TEST LEAD) INSTALLATION. 141' FOOTAGE BETWEEN FITTINGS. TEST RESULTSTEST RESULTS INFORMATION ON D-4 CARD) FROM OTHER UTILITIES: START TIMESTART TIME B AIRSTOP TIMEAIRSTOP TIMESYS MAOP N/AN/AN/A 164.062 Notification # MINIMUM CLEARANCE andrew.baunsgard@pse.com Yes NoYes No Project Manager Contact Information: 5 500882201504491487504491489 Emer Sect ANDREW BAUNSGARD Type MPE OP MAP BY --------- SOAPSOAP HORIZONTAL: 5' / / / / / / / / 425-495-4465 Pipe Size 60CONTACTPHONE# UTILITIES VERTICAL: 1'Service/MeterService/MeterService/MeterService/Meter SAP Superior Dis. Reg. / FT 2" DATE HP Svc/MSA Ind. ServicePSE Retirement "Flagging Required" "Locates Required" PROJECT PHASE SNOHOMISH Ind. MSANE 26-27-03 Relocate 10.11.12.13.14.15.17.DESIGN PRESS 18.DESIGNED BY 1.2.3.4.5.6.7.8.9. Type/Work TYPE TESTTYPE TESTPRESSURE PRESSURE INSTALL 2023 03/10 DATE OFFDATE OFF Cell Phone: DATE ONDATE ON REV# Manager:COUNTY 1/4 SEC 1 32 E-Mail: GAS LENGTH Completed post installation inspection per GOS 2525.1200 and 2525.2700. (CHECK BOX TO CONFIRM COMPLETION) Recorded all required information on the as-built per GOS 2500.1700. Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: InfraSource Construction Date ______________ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 DEPTH Reviewed and complied with all construction notes. Left the work area in a clean and safe condition. HOLE HOG TABLE Scale: NONE ROADWAY CROSS SECTION LOCATION FITTER'S CHECKLIST 4680 06/11 STARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTART ENDENDENDENDENDENDENDENDENDEND CALLOUT BP10BP11BP12BP13BP14BP15BP16BP17BP18BP19BP20 BP1BP2BP3BP4BP5BP6BP7BP8BP9 KEY FOR PITS A 1031 1045 4 0 1 MPE I 021 1 R S B - A SCALE: 1" = 30'-0" PLOT PLAN B 5' 16' 3' 7' PINE ST 2ND AVE S S E V A D N 2 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 3/29/173/30/17 DATE 2/2 ....PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 107053987 425-495-4465425-424-6426425-424-6549425-495-4465N/AN/AN/A PHONE NO 1"=20' For contacts below dial 1-888-CALL PSE (225-5773) PERMIT SCALE A.BAUNSGARDA.BAUNSGARD G.VUKOSAV CONTACT D.DAO REAL ESTATE/EASEMENT N/AN/AN/A N/A 2" MPE IP MAIN EXTENSION (2 LOTS) PROJECT MGRAPPROVED BY CP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY 1045 2ND AVE S, EDMONDS, WA 98020 ENGR - GAS DRAWN BY JULIE LYNN-HANSON FUNCTION MAPPING N/AN/AN/A CSPBTGPM 164.065 GAS WK CTR PLAT MAP DESCRIPTION N/AN/AN/A 164.062 andrew.baunsgard@pse.com Yes NoYes No Project Manager Contact Information: 5 Emer Sect ANDREW BAUNSGARD OP MAP BY 425-495-4465 CONTACTPHONE# UTILITIES DATE PSE "Flagging Required" "Locates Required" SNOHOMISH NE 26-27-03 DESIGNED BY Cell Phone: REV# Manager:COUNTY 1/4 SEC 1 32 E-Mail: