107053987.pdf
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 3/29/173/30/17
DATE
1/2
....PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
107053987 EDMONDS
107053987
N
office
425-495-4465425-424-6426425-424-6549425-495-4465N/AN/AN/A
PHONE NO
PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.
1"=20'
MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED
EXCEPT AS
EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
206-321-8089
INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY Owner / Developer Contact Info
For contacts below dial 1-888-CALL PSE (225-5773)
PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS
PERMIT
NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
SCALE
DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT
PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY
EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED
Scale: NONE
COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS
ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
TYP. UTIL. CROSSING SECTION
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND
A.BAUNSGARDA.BAUNSGARD
G.VUKOSAV
STANDARD GAS CONSTRUCTION NOTES:CONTACT
D.DAO
NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).
TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
JULIE LYNN-HANSON
REAL ESTATE/EASEMENT
N/AN/AN/A
JULIE LYNN-HANSON
EDMONDS, WA 98020
RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
N/A
1045 2ND AVE S
Vicinity Map
2" MPE IP MAIN EXTENSION (2 LOTS)
PROJECT MGRAPPROVED BY
CP APPROVAL
WORK
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
1045 2ND AVE S, EDMONDS, WA 98020
CLEARANCE
SITE
ENGR - GAS
GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.
1' MIN.
DRAWN BY JULIE LYNN-HANSON
FUNCTION
16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.MAPPING
ATTN:
N/A
___________________________, PHONE______________.
Manufacturer
THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
TESTED BYTESTED BY
WATERWATER
N/AN/AN/A
107053987106322898
SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG
CSPBTGPM
Order #164.065
GAS WK CTR
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
45
NITROGENNITROGEN
PLAT MAP
Act Lgth
GAS MAIN INSTALLATION/RETIREMENT
---------
FF
45 PSIG
GAS MAIN PRESSURE & TESTING
PP
DESCRIPTION
OPERATING STANDARD 2525.2500.
Est Length
BOX (TEST LEAD) INSTALLATION.
141'
FOOTAGE BETWEEN FITTINGS.
TEST RESULTSTEST RESULTS
INFORMATION ON D-4 CARD)
FROM OTHER UTILITIES:
START TIMESTART TIME
B
AIRSTOP TIMEAIRSTOP TIMESYS MAOP
N/AN/AN/A
164.062
Notification #
MINIMUM CLEARANCE andrew.baunsgard@pse.com
Yes NoYes No
Project Manager Contact Information:
5
500882201504491487504491489
Emer Sect
ANDREW BAUNSGARD
Type
MPE
OP MAP
BY
---------
SOAPSOAP
HORIZONTAL: 5'
/ / / / / / / /
425-495-4465
Pipe Size
60CONTACTPHONE#
UTILITIES
VERTICAL: 1'Service/MeterService/MeterService/MeterService/Meter
SAP Superior
Dis. Reg. / FT
2"
DATE
HP Svc/MSA
Ind. ServicePSE
Retirement
"Flagging Required"
"Locates Required"
PROJECT PHASE
SNOHOMISH
Ind. MSANE 26-27-03
Relocate
10.11.12.13.14.15.17.DESIGN PRESS
18.DESIGNED BY
1.2.3.4.5.6.7.8.9.
Type/Work
TYPE TESTTYPE TESTPRESSURE
PRESSURE
INSTALL
2023 03/10
DATE OFFDATE OFF
Cell Phone:
DATE ONDATE ON
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail:
GAS
LENGTH
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
(CHECK BOX TO CONFIRM COMPLETION)
Recorded all required information on the as-built per GOS 2500.1700.
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: InfraSource Construction Date ______________
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
DEPTH
Reviewed and complied with all construction notes.
Left the work area in a clean and safe condition.
HOLE HOG TABLE
Scale: NONE
ROADWAY CROSS SECTION
LOCATION
FITTER'S CHECKLIST
4680 06/11
STARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTART
ENDENDENDENDENDENDENDENDENDEND
CALLOUT
BP10BP11BP12BP13BP14BP15BP16BP17BP18BP19BP20
BP1BP2BP3BP4BP5BP6BP7BP8BP9
KEY FOR PITS
A
1031
1045
4
0
1
MPE
I
021
1 R
S
B
-
A
SCALE: 1" = 30'-0"
PLOT PLAN
B
5'
16'
3'
7'
PINE ST
2ND AVE S
S
E
V
A
D
N
2
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 3/29/173/30/17
DATE
2/2
....PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
107053987
425-495-4465425-424-6426425-424-6549425-495-4465N/AN/AN/A
PHONE NO
1"=20'
For contacts below dial 1-888-CALL PSE (225-5773)
PERMIT
SCALE
A.BAUNSGARDA.BAUNSGARD
G.VUKOSAV
CONTACT
D.DAO
REAL ESTATE/EASEMENT
N/AN/AN/A
N/A
2" MPE IP MAIN EXTENSION (2 LOTS)
PROJECT MGRAPPROVED BY
CP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
1045 2ND AVE S, EDMONDS, WA 98020
ENGR - GAS
DRAWN BY JULIE LYNN-HANSON
FUNCTION
MAPPING
N/AN/AN/A
CSPBTGPM
164.065
GAS WK CTR
PLAT MAP
DESCRIPTION
N/AN/AN/A
164.062
andrew.baunsgard@pse.com
Yes NoYes No
Project Manager Contact Information:
5
Emer Sect
ANDREW BAUNSGARD
OP MAP
BY
425-495-4465
CONTACTPHONE#
UTILITIES
DATE
PSE
"Flagging Required"
"Locates Required"
SNOHOMISH
NE 26-27-03
DESIGNED BY
Cell Phone:
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail: