Loading...
1104_001.pdfT Corrections to Building Permit drawings for Project # BLD20W-0423 Written responses and summary of corrections made. Buildin General Plan Review Note: A stamp from CG engineering has been added to Sheets S2.1 and S2.2 stating the drawings have been reviewed for conformance with the structural requirements. S2.1:1. There is an existing note on Drawing #3, Sheet A3.1 showing the insulation in the raised up floor area of the existing garage is to be R = 38 spray in foam insulation (non air permeable). This should negate the requirement for underfloor ventilation and a separate vapor barrier.