Loading...
11-0669 Plan Review Comments #2.pdfCITY OF EDMONDS m 121 5"' AVENUE NORTH m EDMONDS, WA 98020 4�) PHONE: 425.771.0220 ® FAX: 425.771.0221 ® WEB: ���ww e_df k'ffl( SW c)v; DEVELOPMENT SERVICES DEPARTMENT: PLANNING ® BUILDING February 1, 2012 Brian Thaete brianthaete@hotmail.com RE: PLAN REVIEW COMMENTS #2 FOR PLAN CHECIS # 2011-0669 TRIEU SF'R AT 7109 LAKE, BALLINGER WAS' Dear Brian, I have reviewed the above building permit application for the Planning Division. Before I can sign off on the permit, however, the following information needs to be clarified in a written response: 1. Critical Areas: PARTIALLY ADDRESSED. A noted was added to the site plan submitted January 31, 2012 indicating that a wetland delineation was done in March 2011 by Habitat Ecology and Design, Inc. A Category 3 wetland boundary is now shown along with a buffer — please submit the full delineation report from Habitat Ecology and Design. Also, submit a flood hazard study as required by ECDC 23.70. The project site abuts Lake Ballinger. The critical area checklist associated with the address (CRA-2001-0100) noted this and indicated the possible presence of wetlands adjacent to the lake. In addition, there is a mapped Zone A flood hazard at the subject location according to FIRMMcrp Panel 1315. As a result, critical area studies are required as part of this development project, including: a wetland report prepared pursuant to Chapter 23.50 of the Edmonds Community Development Code (ECDC), and a flood hazard study prepared according to Chapter 23.70 ECDC. In each case, you may use either a consultant from the City's roster (enclosed) or one of your own choosing. If you use a consultant that is not on the approved list, however, third party review of the reports is required (ECDC 23.40.090). 2. Corner elevations and height calculations: PARTIALLY ADDRESSED, but the recalculated average elevation shown on Sheet 7 was not updated to reflect the change from 293' to 292.5'. Please redline or update the average elevation on Sheet 7. Please verb the northern corners of the calculated height rectangle. It appears that each point is about halfway between the 288' and 286' foot topo lines but both are labeled as 288'. 3. Structural lot coverage: ADDRESSED. Please verify the structural lot coverage for the proposal. According to ECDC 21.15.110, " [c]overage means the total ground covet -age of all buildings or structures on a site measured from the outside of external walls or supporting members or from a point two and one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area. 4. Concrete toad: ADDRESSED. A concrete pad for gas tanks is noted on Sheet 7. Please show this pad on the survey map. Note that no structures greater than 3' may be located within a required setback area except those noted in ECDC 16.20.040, as well as residential fences less than six feet in height and retaining walls, rockeries, and similar improvements of a minor character less than three feet in height. Please submit three copies of your updated site plan (one being reduced size of 11 x17 or smaller) and two sets of any updated sheets of the building plans. Please make all submittals to a Permit Coordinator, Monday through Friday, 8:00 am to 4:30 pm. If you have any questions, please contact me at (425) 771-0220. Sincerely, l� Mike Clugston, AICP Associate Planner