Loading...
11-1025 CANOD.pdfCity of Edmonds Critical Area Notice of Decisiol Applicant: Property Owner: Critical Area File #: U IPermit Number: Ce ® Site Location: . Parcel Number: 4 Project Description: Conditional Waiver. No critical area report is required for the project described above. 1. There will be no alteration of a Critical Area or its required buffer. 2. ,i The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040.-�Pt� �pl;�a�,}, k�sy �ecgp�c. all ex;tw`��®®�;n. �B� Bne,1�ti:eln;s 1c§1er ry esJ ®TB� to GRVS4;,g be.� .f"n �� i'°JAi Vail ai'� 3. The proposal is exein f p sulant`/ol'EGDC 23.4 .2 ❑ Erosion hazard. Project is within erosion hazard area. Applicantlmust prepare an erosion AT"-,�; sediment control plan in compliance with ECDC 18.30. ❑ Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: 1. The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. ❑ Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23,40.1.60 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. ❑ Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria ii1 ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. ❑ Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). Reviewer 1 Z re Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 ul i� ul� i 171 rn rr IZD 77 q 0 t� —3 G3 - 120, ?z