12-0156 Plan Review Comments.pdfCITY OF JIJI)1'Y ONDS ® 121 5`r' AVENUE NORTH . EDMONDS, WA 98020
PHONE: 425.771.0220 ® FAX: 425.771.0221 . WEB: www.edrrrorral;,�wa,gory
WIP� DEVELOPMENT SERVICES DEPARTMENT: PLANNING® BUILD ING
March 8, 2012
David Clobes
7425 Olympic View Drive
Edmonds, WA 98026
Dear Mr. Clobes,
I have reviewed the above building permit application for the Planning Division. Before I can sign off on the
permit, however, the following information needs to be clarified in a written response:
1. Structural lot coverage: On the site plan, please include structural lot coverage calculations.
According to ECDC 21.15,110, "[c]overage means the total ground coverage of all buildings
or structures on a site measured from the outside of external walls or supporting members or
from a point two and one-halffeet in from the outside edge of a cantilevered roof, whichever
covers the greatest area." Show the total lot area in square feet as well as that square footage
covered by structures and then calculate the percent coverage. Include the reduced deck area
which is being reviewed with this permit.
2. Height calculations: I am unsure whether the entire roof structure above the deck is being
removed or whether the remaining 7.5' of deck will be covered. If the remaining deck will be
covered by a roof, please submit height calculations for the structure. Handout B41 describes
how to prepare height talcs:
Grfil`r.:!/w i v:.,cclrrrclrtcl, � _, ryr��fi�r�<l >,r f(" ➢ /(_c vcrn�aacl�I/ h�..1I4Ir�ti��ents/De e�lojwi nt r` ervices/ffi
0dir_1.. v . ➢(,ti_➢".1.>d. it ➢rvr,wicrrr/➢'srrr,r ➢YarrriorrT;/1111..
All referenced code sections are available at the following website:
hqp //wmivwjn sc c rp,/rirc°/edi-rioiids/1 da=o_rc>n(isnr. krd1_�il.
Please make all submittals to a Permit Coordinator, Monday through Friday, 8:00 am to 4:30 pm. If you
have any questions, please contact me at (425) 771-0220.
Sincerely,
`le)
Mike Clugston, AICP
Associate Planner