Loading...
12-0234 Plan Review Comments #3.pdfCITY OF EDMONDS • 121 5" AVENUE NORTH • EDMONDS, WA 98020 PHONE: 425.771.0220 • FAX: 425.771.0221 • WEB: www.edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT: PLANNING • BUILDING May 21, 2012 Greg Gorsuch gsgorsuch@comcast.net RE: PLAN REVIEW COMMENTS #3 FOR PLAN CHECK # 2012-0234 ADDITION/REMODEL AT 9207 OLYMPIC VIEW DRIVE Dear Mr. Gorsuch, I have again reviewed the above building permit application for the Planning Division. Before I can sign off on the permit the following information needs to be clarified in a written response: 1. Height calculations: Please include the lines of average grade, proposed, and maximum allowed heights on the north elevation drawing (Sheet 2). 2. Geotech report and site plan: On the Plot Plan, please show the buffer and setback lines recommended by Dennis Bruce in his geotech report dated July 29, 2011. On page 9, he mentions under the first bullet point using 25' from the top of the slope but then talks about a "City of Edmonds requirement for a forty foot (40') setback." There is no specific requirement in this case but rather whatever the recommendation is of the licensed geotechnical engineer. If it is 25' from the top of the slope, indicate a 10' buffer and 15' building setback line on the site plan. If 40' is selected, show a 25' buffer and 15' building setback line. All referenced code sections are available at the following website: http://www.mrsc.org/mc/edmonds/Edmondsnt.html. Please submit three copies of your updated site plan (one being reduced size of 11 x17 or smaller) and two sets of any updated sheets of the building plans. Please make all submittals to a Permit Coordinator, Monday through Friday, 8:00 am to 4:30 pm. If you have any questions, please contact me at (425) 771-0220. Sincerely, Mike Clugston, AICP Associate Planner