Loading...
12-20-17 - Doug's Lynnwood Mazda -Parking Lot - RU Scope.pdf Romtec Utilities, Inc. ~ 18240 North Bank Road ~ Roseburg ~ Oregon ~ 97470 Office 541-496-9678 / Fax 541-496-0804 romtec3@romtecutilities.com 18240 N. BANK RD ROSEBURG, OR, 97470 P: 541-496-9678 F: 541-496-0804 INFO@ROMTECUTILITIES.COM PART 1: GENERAL 1.1 Description Project Name: Doug’s Lynnwood Mazda – “Parking Lot” Stormwater Lift Station Location: Edmonds, WA Date: 12/20/17 The following are a few design consideration that Romtec Utilities would like to be clear on: • Romtec Utilities design this lift station as a duplex (two pump), redundant, alternating system to meet the required pumping rate of 12 GPM. Each pump is capable of pumping 12 GPM. • Romtec Utilities is suggesting the use of a 1” SCH 80 PVC force main. • Romtec Utilities is suggesting that the discharge point for the lift station be 3’ below grade. This allows for access to the in-well valves and provides additional head to help with the pump selection. • Romtec Utilities has configured this lift station to operate on 120V/Single phase power • Romtec Utilities is proposing the use of non-explosion proof pumps for this application. • Onsite backup power generator to be supplied by the project owner, not Romtec Utilities. Please review the scope of products and services defined below: 1.2 Overview of Scope A. Romtec Utilities work shall include designing and supplying the piping, mechanical, and appurtenances within and adjacent to the wet well as a complete, pre-designed, packaged pump station as described herein. Romtec Utilities shall be solely responsible for proper integration, supply, performance, and warranty of all package pump station components provided by Romtec Utilities. B. Romtec Utilities will provide complete submittal documentation for review including mechanical and electrical component drawings, data sheets and the layout of the Romtec Utilities supplied components on the customer supplied AutoCAD site plan. C. Romtec Utilities will work with the site engineer, reviewing entity, and all other associated parties through the review, comment, and approval process for the pump station. D. Romtec Utilities will manufacture and deliver the pump station as described below to the job site for the contractor. A representative of Romtec Utilities will be present the day the pump station is installed to provide technical advice to the contractor. E. After installation, pump station start-up will be performed by Romtec Utilities. PAGE 2 OF 5 Romtec Utilities, Inc. ~ 18240 North Bank Road ~ Roseburg ~ Oregon ~ 97470 Office 541-496-9678 / Fax 541-496-0804 romtec3@romtecutilities.com F. Romtec Utilities will provide the Operation & Maintenance manual and as-built drawings for the pump station at start-up of the system. G. The installing contractor is responsible for pump station installation. Contractor work will generally include site preparation, excavations, backfill, compacted foundation construction, and all mechanical and electrical component installation. H. Romtec Utilities does not perform any construction at the site. 1.3 Pump Station Design and Submittals A. Romtec Utilities will provide the complete lift station design and submittal package for the pump station for review and comment by the reviewing entity. Romtec Utilities’ submittal will include the complete lift station design for all structural, mechanical, electrical, and communication aspects of each pump station. B. Romtec Utilities will provide the Scope of Supply and Design Submittal in electronic form and we will work with all parties through review and approval by the reviewing entity. PART 2: PRODUCTS 2.1 Prefabricated Wet Well and Mechanical Romtec Utilities will prefabricate the wet well structure and associated interior wet well mechanical equipment prior to shipment to your jobsite. The following aspects are included as part of the prefabricated wet well: A. Romtec Utilities will supply the 4’ diameter precast wet well including the top slab with hatch, base, and all associated risers. B. The hatch will be H-20 traffic rated and will include a mushroom cap vent. C. Each cored hole shall have an associated Kor-N-Seal for each particular pipe size entering and exiting the wet well to ensure no water leakage outside the wet well. D. Sealant and tapecoat shall be provided for each section of the wet well to ensure no water leakage through the joints. E. Romtec Utilities will provide alignment brackets for proper orientation during installation. F. Romtec Utilities will be supplying all in-well 1” SCH 80 PVC and 1” flexible plastic discharge piping and fittings from the pump discharge elbow up and through the wet well structure. G. The approximate wet well depth from the rim to the base is 16’. H. The wet well will need to be assembled on site by the installing contractor. I. The heaviest section is the base slab, at 5,000#. J. Romtec Utilities will supply a PVC ball and check valves that will be installed in the wet well. 2.2 Pump Package PAGE 3 OF 5 Romtec Utilities, Inc. ~ 18240 North Bank Road ~ Roseburg ~ Oregon ~ 97470 Office 541-496-9678 / Fax 541-496-0804 romtec3@romtecutilities.com Romtec Utilities will be integrating the pump package into the wet well structure and control panel prior to shipment to the jobsite. The following are the associated pump items Romtec Utilities will be supplying and integrating: A. Romtec Utilities will supply (2) 1/3HP Ebara submersible pumps with all associated piping, stainless steel brackets, stainless steel lifting slings, and cord grips. B. These pumps will be freestanding and will not be fix to discharge elbows or a guiderail system. C. The pumping rate will be 12 GPM at 17’ TDH. D. The pumps have been quoted with 20’ power cables. Note: To meet the required pumping rate of 12 GPM, the operational valves may need to be used to “throttle” the flow. Romtec Utilities will not supply a pump smaller than the proposed 1/3HP Ebara pump. 2.3 Level Control System A. Romtec Utilities is supplying and integrating all in well level sensing for the pump station. This includes four (4) floats as the level sensing for the pump station. B. Romtec Utilities will configure the pump station controls to operate on the specified level sensing devices, and set the levels of the supplied devices at the time of pump station start-up and testing. 2.4 Control Panel A. Romtec Utilities is designing and supplying the control panel and associated field devices for the pump station. The control panel will be prewired, factory tested and UL listed. B. The control panel will be configured with a logic relay controller configured for duplex operation and will be housed in a NEMA 4 painted steel enclosure. The control panel will have a ‘dead front’ for separation of operator and electricity. C. The control panel and pump station are configured for 120V, single phase power. 2.5 Delivery and Installation Services A. A representative of Romtec Utilities will be present the day the pump station is installed to provide technical advice to the Contractor. B. The Contractor shall be responsible for coordinating the required field services with Romtec Utilities. 2.6 Start-up/Testing and Owner Training A. After installation, pump station start-up shall be performed by the installing contractor under the supervision of Romtec Utilities’ start-up technician. B. Start-up to include two (2) days of on-site field service. PAGE 4 OF 5 Romtec Utilities, Inc. ~ 18240 North Bank Road ~ Roseburg ~ Oregon ~ 97470 Office 541-496-9678 / Fax 541-496-0804 romtec3@romtecutilities.com C. Romtec Utilities will provide the Operation & Maintenance manual and as-built drawings for the pump station at start-up of the system. D. O&M manual will include all submittal documentation modified if required, to reflect the as-built condition along with parts lists, maintenance manuals, and electrical schematics. 2.7 Electrical Support and Consulting A. Romtec Utilities provides support for the installing electrician over the phone both prior to and during installation of the pumps station. B. Romtec Utilities electrical engineering staff will help troubleshoot issues encountered on-site during construction as well as during normal operation of the pump station. This service is available to both the installing contractor as well as the owner and their maintenance personnel. 2.8 Exclusions A. Romtec Utilities is only supplying the items that are specifically stated in this scope letter. All other components are Contractor supplied. Please contact Romtec Utilities if there is any question regarding scope of supply or services. B. Romtec Utilities will not be providing any structural calculations associated with the pump station. Note: Romtec Utilities can provide structural calculations if a geotechnical report is provided to Romtec Utilities by the customer. The addition of structural calculations as a requirement will result in an increased lead time to produce the full submittal package. C. The installing contractor is responsible for all of the following: 1.Any fasteners not associated with the pre-assembled systems. 2.Unloading trucks, traffic control, site safety 3.Securing materials delivered to project site: dunnage, fencing, storage 4.Excavation, shoring, dewatering, sub-base rock, backfill material 5.Installation of supplied pump station systems and components 6.Piping to and from pump station. 7.Electrical conduit and wiring (except wires attached to supplied components) 8.Concrete poured in place, crushed rock, asphalt paving 9.Site lighting, signage, fencing, bollards and drainage control 10.Actual concrete dimensions will be within +/- 0.5” for major dimensions (height, length, width, core locations, wall thickness, etc) of the approved production drawing. Parking Lot - PRELIMINARY DESIGN - 12-20-17.xlsx PROJECT INFO PACKAGE/STARTUP Job Name:Offering: Company:Mechanical: Contact:Pumps: Job Type:Control Panel: Water Type:Startup: WET WELL SUMMARY Material:12/20/17 0 Diameter:4 Feet Barrels:12 Feet Inside Height:15.00 Feet Storage Depth:0.00 Feet Disch. Piping Size:1" Disch. Piping Type: Disch. Piping Style: Lining:RIM:354.74 WET WELL TOP Traffic Rating:FG:354.74 Hatch Options: Vent Options: WET WELL BASE Base: Lining:DISCH CL:351.74 CRANE Crane:N/A Base/Winch: FORCE MAIN ID/Length 1"5 Type/Rating:INFLUENT:343.07 FM High Point:351.74 HIGH LEVEL:341.24 LAG START:340.99 DUTY POINT LEAD START:340.49 Pumping Rate:12 GPM (Total) Static Head:11.50 Feet LEAD STOP:340.24 TDH:16.7 Feet PRIMARY PUMPS Manufacturer:SUMP:338.74 Model:BASE:338.24 Impeller Model/Dia:3.35"Trim:No Motor HP:1/3 HP Expl. Proof:No SENSOR AND ELEVATION TABLE Voltage/Phase:Elevation Distance Cable Length:20 343.07 Mix Flush Valve:0.00 341.24 JOCKEY PUMP 0.25 Manufacturer:340.99 Model:0.50 Impeller Model/Dia:0 Trim:0 340.49 Motor HP:0 Expl. Proof:0 0.25 Voltage/Phase:340.24 Cable Length:0 1.50 Mix Flush Valve:338.74 VALVE VAULT METER VAULT Valve Size:N/A Valve Size:N/A Hatch:Hatch: Pressure Gauge:Pressure Gauge: Check Options:Shut Off Options:0 Shut Off Options:0 Options: Options:Options: Options:Options: Options:Flow Meter: CONTROL PANEL GENERATOR Power:Model: Controller:Enclosure: Primary Sensor:Transfer Switch: Secondary Sensor:Options: Enclosure:Options: Pump/Sense Wiring:CONTROL BUILDING Options:Type: Options:Size: Parking Lot Complete System Stormwater CURRENT REVISION New Station Duplex Configuration Ebara Concrete PVC SCH80 Checks, 2 Valves, Manifold Unlined SCH80PVC H-20 Occasional N/A Mushroom Cap Vent (Side) Flat sump No Lining Sensor Spacing Description 0 0 Invert In Sensor Spacing 115V / 1-Phase OPTIMA-3MS1 0 Pump Stop Sensor Spacing 0 0 Lead Start Sensor Spacing 0 Lag Start 0 0 Sensor Spacing 0 0 HL Alarm 0 Sump Floor 120V / 1-Phase N/A 0 0 0 0 0 0 0 0 N/A N/A 0 Audible Alarm N/A Direct Alarm Beacon 0 N/A 0 NEMA 4 0 Alternator 0 4 Floats Customer : Romtec Utilities Reference : Parking Lot Pump Performance Datasheet Ebara Quotation System 17.5.2.0 Ebara International Coporation - Fluid Handling Division 1651 Cedar Line Dr, Rock Hill, South Carolina 29730 USA Tel: (803) 327-5005 Fax: (803) 327-5097 www.pumpsebara.com Item number : Default Service : Quantity : 1 Quote number : Product Description : OPTIMA-3MS1 Stages : 1 Based on curve number : EPPD-3 Rev Optima Date last saved : 20 Dec 2017 9:17 AM Operating Conditions Flow, rated : 12.00 USgpm Differential head / pressure, rated (requested): 16.70 ft Differential head / pressure, rated (actual): 20.90 ft Suction pressure, rated / max : 0.00 / 0.00 psi.g NPSH available, rated : Ample Frequency : 60 Hz Performance Speed, rated : 3600 rpm Impeller diameter, rated : 3.35 in Impeller diameter, maximum : 3.35 in Impeller diameter, minimum : 3.35 in Efficiency : 21.28 % NPSH required / margin required : - / 0.00 ft Ns (imp. eye flow) / Nss (imp. eye flow): 2,280 / - US Units MCSF : 4.00 USgpm Head, maximum, rated diameter : 24.88 ft Head rise to shutoff : 19.02 % Flow, best eff. point : 24.34 USgpm Flow ratio, rated / BEP : 49.30 % Diameter ratio (rated / max): 100.00 % Head ratio (rated dia / max dia): 100.00 % Cq/Ch/Ce/Cn [ANSI/HI 9.6.7-2010]: 1.00 / 1.00 / 1.00 / 1.00 Selection status : Acceptable Liquid Liquid type : Water Additional liquid description : Solids diameter, max : 0.00 in Solids concentration, by volume : 0.00 % Temperature, max : 68.00 deg F Fluid density, rated / max : 1.000 / 1.000 SG Viscosity, rated : 1.00 cP Vapor pressure, rated : 0.00 psi.a Material Material selected : Stainless Steel Pressure Data Maximum working pressure : 10.77 psi.g Maximum allowable working pressure : N/A Maximum allowable suction pressure : N/A Hydrostatic test pressure : N/A Driver & Power Data (@Max density) Driver sizing specification : Rated power Margin over specification : 0.00 % Service factor : 1.50 (used) Power, hydraulic : 0.06 hp Power, rated : 0.30 hp Power, maximum, rated diameter : 0.35 hp Minimum recommended motor rating : 0.33 hp / 0.25 kW (Fixed) 0.0 0.1 0.2 0.3 0.4 Po w e r - h p Power 0 3 6 9 12 15 18 21 24 27 30 0 10 20 30 40 50 60 70 80 90 100 0 5 10 15 20 25 30 35 40 45 He a d - f t Ef f i c i e n c y - % Flow - USgpm 3.35 in Efficiency MCSF