Loading...
1232 HIGHLAND DR-SITE PLAN.pdfGENERAL NOTES 1. ALL MATT .RIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY DF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICF TIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPA L, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: CU z MENT INTERNATIONAL BUILDING CODE (IBC) 201 i WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AN 3 MUNICIPAL CONSTRUCTION WA, SHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MA NAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT ED " TION) 2. STANDAR -) PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWI�-;E 3. A COPY Of ' THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIO JS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD A ND THE LOCAL GOVERNING AUTHORITY. 5. CONTRAC rOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS - BUILT COPIDI'TIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTA L TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF i .S-BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCYNINAL PROJECT r PPROVAL. 6. ELEVATIO �4S SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCA riONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEE 4 FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABI E RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXW ATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIt ULITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURAC (OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROT ACT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY L( CATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETI ;NESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IM1 IEDIAT ELY OF CONFLICTS THAT ARISE. 8. CONTRAC' 'OR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATIOT SERVICE (1-800-424-5555) AT LEAST 48 WOURS PlUOR TO CONSTRUCTION. i 9. CONTRAC 'OR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT c ITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESEN rATIVE OF ANY DISCREPANCIES. 10. PIPE LENG rHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD COT DITIONS. 11. CONTRAC"OR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE A+'PLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONT :NTS THEREOF. ALL SITE WORK SHALL. BE PERFORMED IN STRICT COMPLIAr CE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTUk AL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMF NDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. SUBGRADI ; SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTE D AT ALL TIMES FROM COMPACTIVE ACTIVITIES (i.e. HEAVY EQUIPMEN T, STOCKPILING). 14. MANHOLE J, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SO IL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT F T SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACT) iD STRUCTURAL FILL PER GEOTECHNICAL REPORT. 15. SEE SURVI Y AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATION 3 OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 16. SEE ARCHI rECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATI 3N DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHAL , BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATEI ) ON THE PLANS. 17. ALL REQU i RED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATIO?4 PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 18. ALL ROOF 3RAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EX' 'ERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, L, NLESS NOTED OTHERWISE. 19. ALL FOOTI vG DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT -0 THE DRAINAGE SYSTEM DOWNSTREAM OF THE SITE STORMWA rER DETENTION SYSTEM. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. CONSTRUCTION SEQUENCE NOTES 21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION PROVIDE TO THE CITY WATER QUALITY TECH CIAN, A COPY OF THE AT 425-771-0220, EXT. 1326. TWO DAY (48 HR) NOTICE IS REQUIRED. Q BACKFLOW TEST REPORT. TEST REPORTS CAN B EMAILED TO JEFRKOBLYK(a4EDMONDSWA.GOV. FAXED TO 425-744-6057 OR �BACKFLOW TESTING SHALL 2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROLNOTES. BE COMPLETED BY THE OWNER ANNUALLY THEREAFTER 3. CALL FOR UTILITY LOCATES. 22. AS A h'DNUM IMREQUIREMENT, ALL DISTURBED " ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION 4. INSTALL TESC MEASURES AND MAINTAIN DUST C NTROL WHILE PREVENTING CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND DISTURBANCE OF ANY AREAS OF VEGETATIONO IDS THE CONSTRUCTION STANDARDS. ZONE 23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR_ ALL TEMPORARY SI�IMENTATION AND STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON- SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION REQUIREMENTS. CONTROL PRACTICES AND/OR DEVICES SHALL BE MATAINED UNTIL IN PERMANENT VEGETATION IS ESTABLISHED. 24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY 6. DEMOLISH EXISTING STRUCTURES j SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL, 7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT 8. CLEAR, GRUB &ROUGH GRADE SITE. REVEGETAT?E AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. DISTURBED AREAS NOT SUBJECT TO ADDITIONAL S*ACE DISTURBANCE 26. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW) CONTOURS OR SPOT ELEVATIONS SHOWN. 27. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. i IMPROVEMENTS. 28. CONTRACTOR SHALL BE RESPONSIBLE FOR ANDj SHALL INSTALL AND 13. STABILIZE AND COMPOST AMEND ALL EXPOSEDjSOILS PRIOR TO MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, REVEGETATION OF ENTIRE SITE. EXISTING BUILDINGS, STREETS, WALKWAYS, UTIITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF 14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE - EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE - RESPONSIBLEFOR REMOVAL OF SHORING AND BRACING AS REQUIRED. STABILIZATION AND APPROVAL BY CITY INSPECTOR 29. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 30. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE P-TrERRUPTION§ WITH THE AFFECTED - OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING S ' UTILITIES. 31. ALL UTILITIES SHALL BE PLACED UNDERGRO BEST MANAGEMENT PRACTICES I BMP'S 32. EXISTING UTILITY LINES IN SERVICE WHICH AR4 DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMOJS AND OWNER'S 1. PRESERVE VEGETATION / COVER SOILS WHEN EXPOSED. REPRESENTATIVE PRIOR TO BACKFILLING. 2. CONTROL RUN-OFF. 33. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAC Y BE SCALED FROM 3. INSTALL / MAINTAIN SEDIMENT CONTROLS. DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 4. KEEP FRESH CONCRETE MORTAR OUT OF STORM DRAINS. 5. KEEP WORK AREA CLEAR. MAINTAIN CATCH BASINS. 34. FIELD STAKE ALL UTILITY STUBS AT THE PROPE TY LINE. 6. COVER CONTAINERS & MATERIALS. 35. TRENCH BACKFILL OF UTILITIES LOCATED WM-I[N THE CITY RIGHT-OF-WAY ' 7. PREPARE FOR CLEAN-UP & SPILLS. SHALL BE COMPACTED TO 950%. COMPACTION ST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING. 7 8. DISPOSE WASTES PROPERLY. 36. WHERE NEW PIPE CLEARS AN EXISTING OR NEW JUTILITY BY 6" OR LESS, 9. MINIMIZE WASTE. PLACE POLYETHYLENE PLASTIC FOAM AS A CUSrON BETWEEN THE 10. RECYCLE UNWANTED MATERIAL. UTILITIES. I 11. PRESERVE & ENHANCE WETLANDS, ADJACENT VEGETATION. 37. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE Trr" rrIES 12. EDUCATE EMPLOYEE AND CUSTOMERS. WITHIN THE BUILDING. 38. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. ; MORE INFO: WASHINGTON DEPT of ECOLOGY 39. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION STORM WATER MANAGEMENT MANUAL. SYSTEM. ff 40. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR APPROVAL PRIOR Tr INSTALLATION. ,POST CONSTRUCTION SOIL QUALITY AND DEPTH - BMP T5.13: DESIGN GLHDE P ES SOIL RET PO1V lW DUFF LAYER AND NATIVE Tt71nM SHOULD iC A7MIED NV M lNY0 nAR O STATE TO THE MAXMif1IM a'MVT PRACTICABLE: NV ANY AREAS REQUIRING ORA M REMOVED AND SWME THE DUFF LAYER MID TDPSIDIL ON SIIE N DE57pMAIED, CONW UM AREA, NOT AaMCWT 70 THE PUSW RE30tA4GE;4 AND CN77CAL AREAS, IV BE RMPF ED 70 OTHER PORIXWS OF DBE SITE LINERS FEASWE SOIL MAUTY ALL AREAS S &ECT TO aEARING AND WADNG THAT HAVE NOT BEEN COMBED BY MMMUS SURFACE~ OWtFARAIED AM A ORMVAGE FACILITY O4 FJVplVET U AS STRXXIRAL FILL OR SLOPE StALL. AT PRWT COM U71M DETilpVS7RMTE VE FML01NNo 1. A TtaPSK LAYER NAH A W&W ARCUNC CaVYWr N 7Lff AREAS AND A PIN FRW 6.0 70 80 OR MATLaWO 7W PH OF THE OR=4 UNDtSILIMED SOIL IEEE MPSABL LAYER SMIAU HAW A Mf9YN" DEPTH Or 8 PKM D'OEPT MERE TREE ROOTS LWT THE DEPTH OF lNCCIVWTION OF AMElV1JM NIS NEEDED 70 AAEET THE OP/TPRIA. SIR.5IOK.S 8EEOW THE' TOIPSOIE LAYER STADtW BE SCARFI ED AT LEAST 4 NICM 167H SOME - NICOIRP07 RON OF INE LPPER NAMWAL TO AKID STRATIFIED LAYERS, WHERE FfASTEfLE: 2 RAN7ING BEDS AMUST BE MNA.I 19D W1H 2 NOES OF ORGAW MAMWAL J QUAUTY OF CD1WOST AND OTHER MATERIAL USED TO MEET V E' OIP&ANTC 0 W7ENT REQtMIPEIIf M A.7NE a%AAVC OOINIENT FUR 'PRE -APPROVED' AAeIDAMW RATES CAN BE MET CRY USING COAfIWT MAT 1UN RE OEFNAIXW OF TObO WIED MU TOW' NV WAC 173-JW SECTION 22Q IBIS CODE IS AVAMBLE AT 17 E D&T. OF Ei' OLOGYS N MSM HM,IIOWWW.ECY. WA.GOV/"WWAMtS/SWAIUMPOST/ RE COMIAotST MUST ALSO HAVE AN GIR"W MATTER CDNTENT OF = TO 659 AND A CARBON T01►VTROGEM RAB0N BELOW 2&1. X CAR80M 70 MITRO6EAI RAW MAY 8E AS WW AS J&1 FUR RANMW OgHPM ENTIRELY OF RAM NATIVE 70 THE PUGET SOUND LOKANDS REGM B CALOULATED AMI00"T RATES MAY BE MET P ROU01 USE GF CDAi W?ED MATERMLS AS D NED ABOVE; OR OTHER 0I1WM MATOW AMENDED TD ABET THE C001 70 NITROGEN RATIO REQLNE"M AAm MEE M RE CONTAW4ANT STANDARDS OF GRADE A COMMPOl4T. THE RESW.T7NG SOIL STI " BE COWDL/OVE TO THE Tff OF MUAIM M BE ESTAROM MPLEMfWA WN OP77M THE SOIL QUAUTY DEM GLDDEim LISTED ASOW CAN BE AST BY UM OA E OF TIE AERM USIM BELO* 1. LEAVE tOW7MO NATIVE WG>ETAT7AN AAm SOR, AND FR07ECT FROM COIIMPACMW OtN W COW87RIACMK 2 AMEND EVSWG SyIE MRSOIL OR SUBSOIL EITHER AT DET'AIAT 'PRE -APPROVED' R47M OR AT GYISTW CALOIILATED RATES BASED ON SAEOM 7ES7S OF 7W SOIL AND AAIEWWEMr . .1 SjoaftE EXISTING TLaPSAIL DURWG QUO04 AND REPLACE PRW 70 PLANIM D&TH REVMGnTS E7M AT DIFALE.T IW-APPROVED' RATE OR AT A CUS70M CALCULATED RAZE; 111.91M, IM 11�11111111.; OWNERS: CHUCK and GAYE BARRETT 2103.2nd AVE WEST SEATTLE 98119 "Nothing in this permit approval plvicese shall be 2064994605 CHUCK interpreted as allowing or permitting the 425-776-7294 ext 107 GAYE maintenance (if anY c�` `' eritly existingillegal, nonconforming or unpexmztteo builifing, ss:u¢tuse or site condition which is outside the scope of the rmit application, TAX No 0042 300000 0600 pe regardler�s of Whether such ,uilding, structure or condition is shown on thr: LEGAL: EMERALD HILSS BILK OOLOT 6 site Ian or dram,: =.g. Such building, structurrs SUB TO ESE TO PUD & GEN TEL. enforccement�a'be arh» s;�41je^", ors seCave.ts CRITICAL AREA; CRA2016-0139 CALO'. SCOPE OF PROJECT: INTERIOR REMODELING (NEW KITCHEN, GENERAL UPDATE) VAULTING KITCHEN/ MASTER BEDROOM CEILINGS As �i REMOVE EXISTING DECKS. REPLACE WITH NEW LOWER DECK: +180 SQ FT NEW UPPER DECK: +612 SQ FT OPEN WOOD DECKS DVILT-' 1117 C ZONE: RS-12 / PRD 1969-1 FLAG LOT : ALL SETBACKS 10.FT �;70 �r-;&par-V; oc z!Ga­A-t• LOT SIZE: 12 632.4 SQ FT .29 ACRE r-a .Lod C o V E2,4E�c €. -------------- �VveYtr{� vw�t,K �70 �S t✓�'. N p GN�'�� IN �.t)o� o 41 (�--- Ir-oo-t"I ki -1 I�ot a~f T}pe Area fleet 1. Men-Reguloted 2!p D �.. f 14444444 2 Replaced 0 0 New (Post 1977) + '.,' . SF, 4, Area D AK_- (Mitigation Reo d JReIn excess ofh"M2re000 a + 2.� i0 SF 8 Total Area M!t tad b Sta mwoter Mmopmwt Sptam(s - 0 Regu<oted Area Not Yet Af7tVated 0 7 Area proposed to be Mltfgated by Low lrromt Dev& mart TocMiques I a SF S Area Pcposed to be Mltlgated thmugih Co venU d SNIP Tedw*m s 0 l>nAD1NG p1ANA11i� CUT. 0 CY FILL: 0 CY FILIm Pstim OWNED/ ONWGTOR AESPUNSWLE FOR LOCATING ALL ON -SITE UTIUTIES. RELOCATIOWREVISION TO AW UTILITIES MAY REQUIRE WPrARATE PERMIT. .51 . Uj - OL d is -NEW 01Stk , `rnq �_ \ CA'1"GEI MW-f F-DlZ- Urrtl _C_ PIz-017Ee-TI-6 Q � PIAN�NG � �p PR tA Lase fZq I 'I-''9I Corner Fla&./ Setback RR.ct6red Actual- 'Foe- cIt" 4 Front SW ___39..' _ _ _ -_ :1-:k I Sides - A1t . _._ �� l O l - Rear P"'E'��' es rod o1JLee�} .6 Row Other _ HOW S' D`` OWNERXONTi IACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE ' s 'fo tZNI D lZA 1 N � o a rat � f? n tJ f� A 1Z0 U N O GD tZN FApplicantall repair/replace all damage to ntage improvements in City per City standards that Is caused ring the permitted project. APPROVED BY ENGINEERING Z&k492 Dale: S�T7/a V cffy COPY N RESUB C MAY 16 2017] Nam_