Loading...
125 3RD AVE N.PDF11111111111111 14602 125 3RD AVE N fnc. 1800 CITY OF EDMONDS BARBARA FAHEY 121 5TH AVENUE NORTH • EDMONDS. WA 98020 • (425) 771-0220 • FAX (425) 771-0221 MAYOR COMMUNITY SERVICES DEPARTMENT Public Works - Planning/Building • Parks and Recreation • Engineering • Wastewater Treatment Plant February 4, 1999 Mr. John Mellor, PE 606 Sater Lane Edmonds, WA 98020 SUBJECT: Proposed Fleury LLC Building at 125 Third Avenue North (ADB-98-25) {Plan Review 98-2581 Jo�V" Dear Mr-M-010T: The Engineering Division reviewed your civil site design. The review team notes the following revisions/cotrections. Please contact the review team members directly for questions regarding their comments. Storm drainage — Don Fiene. Hydraulics Fnaineer at (4 25) 771-0220 E- 323 • The methodology of the storm design is okay. Provide as -built for system you describe as installed on the adjacent property. The site plan approved by the City Engineer shows that 28 if of 48" pipe was to be installed. The neighboring detention system is to be inspected as a condition of approval for this project. Provide an erosion control plan that includes sequence of construction, erosion control practices and details, including soil stabilization, silt fence, construction entrance and grading. Trafc — Jamal Mahmoud. Trafc Engineer at (425) 771-0220 Ext. 328 • Pay SEPA for -new PM peak trips generated. Utilities —Jim Waite Water/ewer Supervisor at (425) 771-0235 Ext. 649 • A double detector check valve assembly will be required to be located within ten feet of the Third Avenue North right-of-way. Please show where this will be located. • Provide standard fire hydrant assembly on frontage of Third Avenue North. Additionally, please address the following general comments: • The plans indicate that 23 parking spaces will be provided; yet only 19 are shown on your plans. The Planning Division has determined that a minimum of 20 is required on this site. Please resolve this discrepancy and submit plans for all parking spaces to be provided. • Incorporated August 11, I890 • Sister Cities International — Hekinan, Japan John Mellor, P.E. February 5, 1999 Page 2 Provide detailed floor elevations (cross -sections) along west side of building and at any points of vehicular or pedestrian access. • Show how on -street parking and signage will be revised. When you have prepared a complete submittal, please submit four sets of plans together with the required storni drainage calculations so the Engineering Division can review the project. If you have any other questions, do not hesitate to contact me at (425) 775-7744. Sincerely, �r GORDON C. HYDE Development Services Engineer GCH/erne Enclosure c: Lara Knaak, Permit Coordinator Mr. warren La Pon (425) 774-0580 %r T 'MYSkENGR%GORDY180M DOC Inc. 1890 CITY OF EDMONDS BARBARA FAHEY 121 5TH AVENUE NORTH • EDMONOS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 MAYOR COMMUNITY SERVICES DEPARTMENT Public Works • Planning/Building • Parks and Recreation • Engineering • Wastewater Treatment Plant February 26, 1999 Mr. John Mellor, PE 606 Sater Lane Edmonds, WA 98020 SUBJECT: Proposed Fleury LLC Building at 125 Third Avenue North (ADB-98-25)(Plan Review 98-258) 10 kN Dear-Mr-MVle or: The Engineering Division reviewed your revised civil site design. The review team notes the following revisions/corrections. Please contact the review team members directly for questions regarding their comments. Storm Drainage — Don Fiene Hydraulics Engineer at (425) 771 0220 Ext. 323 • The methodology of the stonn design is all right. Provide as -built for system you describe was installed on the adjacent property. The neighboring detention system is to be inspected as a condition of approval for this project. • Provide an erosion control plan that includes sequence of construction, erosion control practices and details, including soil stabilization, silt fence, construction entrance, and grading. Traffic — Jamal Mahmoud Tra6ric Engineer at (425) 771-0220 Ext. 328 • Pay SEPA for new PM peak trips generated. • Sidewalks and ramps are to be constructed to City of Edmonds standards. Additionally, please address the following general comments: • The plans show 3 1 % and 42% grade transitions from the west edge of the existing alley and the east edge of the second floor parking spaces. The maximum slope allowed is 12%. To achieve this slope, the alley must be raised approximately six inches. Please provide a profile of the alley to show how this elevation change will be implemented. • On -street parking and signage must be the same on both sheets. • The indicated scale of 1"=10' does not match the drawing. • Show wheel stops on all parking stalls. • Incorporated August 11, 1890 • Sister Cities International — Hekinan, Japan John Mellor February 26, 1999 Page 2 When you have prepared a complete submittal, please submit three sets of plans together with the required storm drainage calculations so the Engineering Division -can review the project. If you have any other questions, do not hesitate to contact me at (425) 775-7744. Sincerely, GORDON C. HYDE Development Services Engineer GCHLcmc Enclosure c: Lara Knaak, Permit Coordinator Mr. Warren LaFon — FAX (425) 774-0580 R:IENGR\G0RDV\80250. D0C lnC.189v July 9, 1999 CITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771.0220 • FAX (425) 771.0221 DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Mr. Scott Fleury P.O. Box 6005 Edmonds, WA 98020 SUBJECT: Proposed Fleury LLC Building at 125 Third Avenue North . (ADB-98-25)(Plan Review 98-258) Dear Mr. Fleury, BARBARAFAHEY MAYOR As Jeannine Graf, Building Official indicated in her letter of July 6; Engineering Division staff typically reviews access requirements for building permits. A review of our file for your project shows that you did submit an easement agreement on about December 7, 1998. However, the easement documents in our file have never been recorded. The Building Division files contain the first page only of the recorded document, but apparently no complete recorded easement was ever submitted or received for final review. The Engineering staff that reviewed the easement checked it for legal description accuracy only, without determining whether the physical access was intended to meet the requirements of the Uniform Building Code or Edmonds Community Development Code. I trust this answers your question, but if I can be of further assistance, please contact me at (425) 775-7744. Sincerely, ?(OztON. HYDE Development Services Engineer GCH/cmc c: Jeannine Graf, Building Official R:\ENGR\GORDY\fleuryletttt.DOC • Incorporated August 11, 1890 • Sister City - Hekinan, Japan --UZI s CITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771.0221 DEVELOPMENT SERVICES DEPARTMENT j Q Planning • Building • Engineering nc.189 July 6, 1999 Mr. Scott Fleury Post Office Box 6005 Edmonds, Washington 98020 RE: Soundview Plaza & Fleury Project BARBARAFAHEY MAYOR The City is in receipt of your questions dated 6/23/99 regarding your project and the adjacent Soundview Plaza building. I was told that staff informed you on 6/23/99 that I was out of the office from 6/21/99 to today. I will respond to your questions in order. 1. No. The Uniform Building Code requires exterior wall opening protection based on the distance from property lines. In order to allow unprotected openings in the existing Soundview Plaza exterior north garage wall the building would have to be setback 10 feet from the existing property line. In order for your building to have unprotected openings on the garage south side, your building also must be setback 10 feet from the property line. 2. The original submittal for the Soundview Plaza building (submitted to the City on 4/8/97) did not propose a covered driveway. 3. The City was informed by the Architect of record, Mr. Warren LaFon on 11/13/98 that the garage ceiling/first floor deck was added by the contractor of record without his approval. 4. The City informed the Markezinis's by City letter dated 11/13/98 that revised plans must be provided for the covered, driveway (garage ceiling/first floor deck) or the building must be altered back to match the approved plans. 5. Access easements for building permits are typically reviewed and approved by the City Engineering Division. The Engineering Coordinator is Gordy Hyde. This question has been forwarded to him for his response under separate cover. Thank you, Jeannine L. raf Building Official Cc: Gordy Hyde, Engineering, Coordinator • Incorporated August 11, 1890 • Sister City - Hekinan, Japan 0 0 1 0 0 0 0 0 9 0 3,1 `J`� ---------------------- ----- � � T Y O �� HARVE H. HAR ;s oN 200 DAYTON ST. • EDMONDS. WASHINMON 96020 • (206) 175-2;,.2. DEPARTMENT OF PUBLIC WORKS March 16, 1981 Dear Resident: On February 17, 1981, the Edmonds City Council passed Resolution 488 for construction, reconstruction and repair of deteriorated sidewalks. A puhlic hearing will be held in the Council Chambers at the Civic Center. on April 21,1981 at 7: 30 P.M. You are invited to attend_ this hearing-,f_or_ discussing •'repair of portions of de' terioraIted.si,dewalk' e abutting your property. The"improvmont-of"sidewalks in need of repair at the expense of the abutting property owner is provided by City Ordinance, Chapter 7.20 and Revised Code of Washington, Chapter 35.68. The areas needing repair have been marked in paint on the sidewalk adjoining your property. Reconstruction and repair of these sidewalks must be completed on or before September 1, 1981. In the event impr.nvements are not completed within the above specified time, the City will perform and complete the improvements at-. the expense of the abutting property owner. This action is in response to many citizen requests and pedestrian falling accidents which have been increasing in recent years as a result of sidewalk deterioration and increased pedestrian traffic. Sincerely, FRED F. HERZBERG Director of Public Works APPLICATION for The City of Edmonds SIDE SEWER PERMIT EASEMENT No ........................................... NEW CONSTRUCTION ❑ REPAIRS ❑ 113-04100 OWNER .......... LOUT.s.e... Fnede-ric Cs.en................................... CONTRACTOR.............................---.............................---.................................. PERMIT No....................... ADDRESS ....... 1.25... 3.rd-Ave.....1------------------------------------------------------------- LEGAL DESCRIPTION: LOT No............................................... BLOCK No. ............................................ NAMEOF ADDITION......................................................................................................................................... i • Dye Tested On Sewer 1972 Approved: DATE................................................ By...................................................................... 61 0 *. STREET FILE CITY OF EDMONDS RCk"EI Engineering Department ACTION REPORT JUL 12 1973 Date: July ZZ. Z973 - Sketch Yes on back No Subject: BZad bgrrieR — RECEIVED Routing Initial Date Public Works Dept. 1. 0/0 Street Dept. 2. 3. „ 4. 5. 6. 7. Name Mr. Raumond E. Linton Person/Group initiating action Address Z25 Z/2 - 3d No. Telephone No. ACTION Mr. Linton. an eZderZu aentZeman. s blackberry brush had been piZe4 up on the lot between he and Mrs. Howard (apparently 'ust south of the 4th & W Z The brush is on a vacant lot which -he assumes was done by the Street Dept. Street Dept. must have cleaned this come back and pick up the pile. JUL 1't lyh3 Edmonds Engr. Dept. - All concerned notified Action Completed /0 73